Hunting Lodge Bagwell Lane Odiham Hook Hampshire RG29 1JG
Discharge of condition 5 (Supervision), pursuant to 23/01208/LBC - works to the Hunting Lodge grounds: replace failed fencing, security cameras, new lighting on the main facade, underground cesspit, gabion to solve subsidence, dismantling and like-for-like rebuilding of East Pavilion and Greenhouse.
Hunting Lodge Bagwell Lane Odiham Hook Hampshire RG29 1JG
Discharge of condition 8 (East Pavilion Recording/analysis), pursuant to 23/01208/LBC - works to the Hunting Lodge grounds: replace failed fencing, security cameras, new lighting on the main facade, underground cesspit, gabion to solve subsidence, dismantling and like-for-like rebuilding of East Pavilion and Greenhouse.
Hartland Park Ively Road Fleet Hampshire
Discharge of conditions concerning Development Phase 3: 14 - Woodland Management Plan - 15 - Arboricultural Implications Assessment and Arboricultural Method Statement - 16 - Tree Protection Fencing - 17 - Foul Drainage - 18 - Sustainable Urban Drainage System - 19 - Surface Water Drainage - 20 - Surface Water, Groundwater and Drainage - 26 - Management and Maintenance of Streets - 28 - Pedestrian and Cycleway Provision Along Principal Roads - and 32(a) - Energy and Sustainability Strategy, pursuant to 17/00471/OUT, Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment.
Land Lying To The North Of Vicarage Lane Hound Green Hook Hampshire
Discharge of Condition no. 7 (details of foundations and supporting structures) pursuant to planning permission (ref: 21/02749/FUL) for construction of a temporary 17.87 MW Solar Farm, to include the installation of Solar Panels with LV switch/transformer, customer switchgear/T Boot enclosure, a DNO substation enclosure, security fencing, landscaping and other associated infrastructure
14 Frogmore Road Blackwater Camberley GU17 0NP
Discharge of conditions 1 (Time Limit), 2 (Approved Plans), 3 (Materials) and 4 (Submission Of Details Of Fence/Trellis) pursuant to 23/01023/HOU - installation of decking to rear of property (retrospective).
Land At Blue Bell Lodge Rye Common Lane Crondall Farnham
Discharge of condition 4 (Construction Management Plan), pursuant to 22/02917/FUL - proposed energy storage facility encompassed by 2.4m high palisade fencing and 3.7m high acoustic fencing to provide energy balancing services to the National Grid and access to the public highway
Springwell House The Street North Warnborough Hook Hampshire RG29 1BD
Approval of Condition 2- materials- pursuant to 22/02189/LBC Repairs to brick wall and replacement of existing wooden fence fronting The Street and Tunnel Lane with railings
Springwell House The Street North Warnborough Hook Hampshire RG29 1BD
Approval of Condition 3- materials- pursuant to 22/02188/HOU Repairs to brick wall and replacement of existing wooden fence fronting The Street and Tunnel Lane with railings
Land At Kennels Lane Kennels Lane Farnborough Hampshire
Approval of Condition 3- pedestrian access- pursuant to 17/01506/FUL Full planning application including change of use to a Suitable Alternative Natural Greenspace (SANG) on 27.9ha of land at Kennels Lane including: access; car parking; fencing; pathways; landscaping; earthworks; and all other ancillary and enabling works.
Land Lying To The North Of Vicarage Lane Hound Green Hook Hampshire
Discharge of Conditions no. 6 (Construction Environmental Management Plan), no. 8 (CCTV), no. 9 (Security Fencing), no. 10 (Soft Landscaping and Landscape Management), no. 11 (External Lighting) and no.12 (Maintenance and Fire Safety) pursuant to planning permission (ref:21/02749/FUL) for construction of a temporary 17.87 MW Solar Farm