The School House Odiham Road Heckfield Hook RG27 0LE
Discharge of condition 2 - mortar mix - pursuant to 23/01008/LBC Reinstate the integrity of the roof by replacing frost damaged, failed and end-of-life clay peg tiles to match existing on sections 2 and 3 south and sections 5 and 6 north and nib clay tiles on section 5 south and section 8 north. Removal of timber on dormer cheeks as necessary and replace lead flashings. Reinstate timber with like for like and paint with linseed oil paint to match existing (prime undercoat and top coat).
Woodside Potbridge Road Odiham Hook Hampshire RG29 1JN
Discharge of Conditions 4 (Large Scale Drawings - Roof), 5 (Method Statement), 6 (Details of Materials), 7 (Roof Lanterns) and 8 (Windows/Doors), pursuant to 22/01743/HOU - Erection of a single storey rear extension following demolition of existing conservatory.
12 Whinchat Close Hartley Wintney Hook Hampshire RG27 8TT
Approval of Condition 4- render- pursuant to 23/01243/HOU Demolition of conservatory, new porch/ bay pitched roof and change of external materials from tile hanging to render on front elevation, new side utility room window.
Hunting Lodge Bagwell Lane Odiham Hook RG29 1JG
Discharge of Condtion 3- stays fixing to roof and additional details- pursuant to 23/00475/LBC installation of stays (gable supports)
Adsyst Automation Ltd Yateley Lodge Reading Road Yateley Hampshire GU46 7AA
Discharge of Condtions no. 2 (material samples), no. 3 (Construction Method Statement) pursuant to Listed Building Consent (ref: 22/00168/LBC ) granted for alterations to roof to reinstate original roof profile of the building
4 Pankridge Street Crondall Farnham GU10 5RQ
23/02052/HOUDischarge of conditions 4 (Roofing Material) and 5 (Windows & Doors), pursuant to 23/00544/HOU - erection of a single storey rear extension following demolition of existing conservatory.
Asper Marble And Granite Finns Industrial Park Bowenhurst Lane Crondall Farnham Hampshire GU10 5HP
Discharge of Condition no. 5 (Internal Lobbies) pursuant to planning permission (ref: 22/03045/FUL) for construction of a warehouse building for general industrial use (Land Use Class B2) with a mezzanine level for office, with associated roof rainwater storage tank and parking.
Cowslade Farm West Green Road Hartley Wintney Hook Hampshire RG27 8JN
Approval of Condition 6- west wall- pursuant to 21/01078/LBC Repair and stabilisation of the timber frame, including the removal of modern brick and concrete buttresses and piers. Replacement of modern in-fill bricks with handmade clay bricks. Repair of roof timbers where necessary. Replacement of roof tiles. Reinstatement of double doors to the south elevation. Replacement of some brick infill panels to the east elevation with glass panels. Installation of a shower room. Enclosure of the north extension to create a home gym with replacement roof. Installation of a log burner to the main space.
Cowslade Farm West Green Road Hartley Wintney Hook Hampshire RG27 8JN
Approval of Condition 8- floor- pursuant 21/01078/LBC Repair and stabilisation of the timber frame, including the removal of modern brick and concrete buttresses and piers. Replacement of modern in-fill bricks with handmade clay bricks. Repair of roof timbers where necessary. Replacement of roof tiles. Reinstatement of double doors to the south elevation. Replacement of some brick infill panels to the east elevation with glass panels. Installation of a shower room. Enclosure of the north extension to create a home gym with replacement roof. Installation of a log burner to the main space.
Cowslade Farm West Green Road Hartley Wintney Hook Hampshire RG27 8JN
Approval of Condition 4- method statement for structural works- pursuant to 21/01078/LBC Repair and stabilisation of the timber frame, including the removal of modern brick and concrete buttresses and piers. Replacement of modern in-fill bricks with handmade clay bricks. Repair of roof timbers where necessary. Replacement of roof tiles. Reinstatement of double doors to the south elevation. Replacement of some brick infill panels to the east elevation with glass panels. Installation of a shower room. Enclosure of the north extension to create a home gym with replacement roof. Installation of a log burner to the main space.