QUEENS MEADOW BUSINESS PARK VENTURE COURT HARTLEPOOL
Adjoining Authority Consultation for the erection of 3no. commercial units with associated parking
LAND EITHER SIDE OF THE RIVER TEES
Adjoining authority consultation for the H2 Teesside Project to seek development consent for the construction, operation and maintenance of a hydrogen production plant
HULAM FARM HUTTON HENRY TS27 4SA
Adjoining Authority Consultation for variation of Condition 5 of Durham County Council Planning Permission DM/22/03808/VOCMW in respect of HGV waste vehicle movements
DOGGER BANK TEESSIDE OFFSHORE WIND FARM HARTLEPOOL
Dogger Bank Teesside A and B Offshore Wind Farm Order 2015 (as amended) (the DCO) Requirement 34 Port Access and Transport Plans for Work Nos. 1B of the offshore works in relation to Sofia Offshore Wind Farm (formerly Teesside B Offshore Wind Farm) (Project B) to reconfirm that a PATP is not required based on a tolerance of 30 vehicles (one PCU)
3 BUTTERCUP CLOSE HARTLEPOOL TS26 0FE
Section 73 application for the variation of conditions 2 (approved plans) and 4 (requirement for 2m high fence adjacent to rear boundary of No 5) of planning permission H/2021/0278 (erection of a single storey rear extension) to allow for the reduced height of the required 2m high boundary fence to 1.6m in height (as existing) and provision of obscurely glazed windows to 3no. high level, top-hung opening windows in side/north elevation of proposed extension.
1 HUXLEY WALK HARTLEPOOL TS25 4JW
Erection of a porch to front elevation (retrospective)
3 THE PADDOCK CHURCH STREET SEATON CAREW HARTLEPOOL TS25 1BY
(TRANSFERRED TO H/2023/0344 due to a technical issue viewing documents in Public Access) Change of use of an existing residential swimming pool to a swimming pool for public use (F2 Use Class)
DOGGER BANK OFFSHORE WINDFARM TRUNK ROAD A19 HARTLEPOOL
Dogger Bank Teesside A and B Offshore Wind Farm Order 2015 (as amended) (the DCO) Requirement 34 (1) & (2) Port Access and Transport Plan for Offshore Works in relation to Dogger Bank C Offshore Wind Farm (formerly Teesside A Offshore Wind Farm) (Project A)
YOUTH CENTRE ROSSMERE WAY HARTLEPOOL TS25 5EB
Advertisement consent for the relocation of existing internally illuminated signs
YOUTH CENTRE ROSSMERE WAY HARTLEPOOL TS25 5EB
Installation of 5no. new window openings to first floor level (3no. openings to front/north elevation, 2no. openings to side/east elevation).