Queens Gardens Queens Dock Avenue Kingston Upon Hull HU1 3DJ
Discharge of conditions for 20/01543/FULL - Engineering works including the demolition and/or removal of walls, ramps, steps, railings, lighting, street furniture and other features, hard surfacing, and kerbs and edging. The construction of new walls, ramps, steps, terracing, railings, lighting columns including c15m high feature columns, street furniture, and other features including interpretation and public art, hard surfacing, kerbs and edging, and drainage works, and levelling of sunken peace garden. Soft landscaping including the removal and planting of trees to include new attenuation tree pits Demolition of existing cafe building and erection of combined electricity sub-station, switch room, and gardener's store. (AMENDED PLANS) - conditions 7
Padstow Close Land At; Kingston Upon Hull
Discharge of condition 34 of approval ref. 21/01664/FULL - 1. Erection of 24 dwellings (bungalows) to provide affordable housing, 2. Provision of access roads and car parking spaces, 3. Construction of car park. (Revised Scheme)
Kingswood Academy Wawne Road Kingston Upon Hull HU7 4WR
Discharge of conditions for 20/01003/FULL - 1. Erection of three storey building to rear (east) of existing building; 2. Construction of car park and drop-off areas; 3. Other minor development (including formation of a habitable area). - conditions 3, 4, 5, 9, 10, 11, 12, 13, 14, 15, 17, 20, 21
Maister Lodge Middlesex Road Kingston Upon Hull HU8 0RB
Discharge of conditions for 21/00721/FULL - 1) Alterations to building involving construction of new flat roof canopy with erection of single storey extension 2) Siting of 2 x two storey temporary modular buildings - conditions 4
Land At North End Of Elba Street Kingston Upon Hull
discharge of conditions for 19/00836/FULL - Erection of workshop and ancillary offices and laying out of storage area and associated parking. - conditions 5, 6, 7 Regarding condition 7: The FFL of the Offices and Workshop are to be sited at a min 300mm above adjacent ground level and as stated on our planning submission drawings 003 & 004. The proposed 1 in 100 year flood event modelling has stated that flood levels during this event will be at 205mm above ground level which is below the FFL of the buildings. In addition the components used in the construction of the modular building are inherently flood protected i.e. the structural chassis and external wall panels are galvanised steel products, all services are via dado trunking at a level of 900mm and if any perishable material is effected by flood damage and requires replacement it can easily be replaced using stock replacements by the on site refurbishment technicians. Due to the modular nature of the building it is even possible to replace individual effected modules as and when necessary using stock modules from the applicant's manufacturing facility