Land North West Of Tesco St Marys Road Ramsey
Discharge of conditions 10 (Construction Environmental Management Plan) and 15 (Travel Plan) of 19/00364/OUT on Phases 01 and 03.
Land East Of 14 Harvard Way Harvard Industrial Estate Kimbolton
Discharge of Condition 3 (Surface water during construction) for 21/02527/FUL
Wintringham Park Cambridge Road St Neots
Discharge of conditions 2 (Hard Landscaping), 7 (Road Construction, Management and Maintenance), 13 (Details of Cycle Parking Bollards) and 14 (Benches and Bins Details) for 22/00734/REM
Land West Of 12 Fox Road Catworth
Reserved Matters for 20/01724/OUT Details of Access, Appearance, Landscape, Layout and Scale including also discharge of conditions 6 (levels), 7 (Biodiversity), 10 (Tree) and erection of a temporary static caravan for the construction phase only.
155 High Street Huntingdon PE29 3TF
Discharge of conditions 4 (Window Construction) and 5 (Window 6) of 23/00692/LBC
Land West Of The Avenue Ramsey
Discharge of Conditions 13 (Fire Hydrants), 28 (Highways 1), 30 (Highways 3 construction of access) and 32 (Highways 5 Visibility) for 19/00552/OUT
Land South Of Lime Kiln Lane Stilton
Discharge of Conditions 3 (External Materials), 5 (Drainage), 6 (Construction Phase), 7 (Drainage), 8 (Fire Hydrant), 9 (Biodiversity), 11 (Lighting), 13 (External Storage) and 14 (Bin Store) for 22/01676/FUL
Ashlea Potton Road Hilton Huntingdon PE28 9NG
Discharge of conditions 3 (Materials), 15 (Construction Management Plan) and 16 (Finished Floor Levels) of 20/01069/FUL
Wintringham Park Cambridge Road St Neots
Discharge of conditions 2 (hard landscaping), 4 (bus stop specification), 7 (road construction, management and maintenance details), 8 (bridge links for pedestrians and cyclists) and 18 (bird hide details) and partial discharge of conditions 16 (details of play equipment and cycle stores) and 17 (benches and bins details) of 21/00806/REM as amended by 22/00761/NMA and 22/02187/NMA
Former 11 To 12 The Pavement St Ives
Discharge of Conditions 3 (Environmental Management Plan), 4 (Surface Water Drainage), 5 (Surface water Runoff During Construction), 6 (External Materials), 7 (Architectural Details), 9 (Ecological Enhancement) and 14 (Plant and Equipment Details) of 22/01439/FUL.