20 Lynn Road Southery Downham Market Norfolk PE38 0HU
Construction of one dwelling & garage following demolition of existing bungalow and outbuildings.
Botany Bay Stonehouse Road Upwell Wisbech Norfolk PE14 9EA
Demolition of existing dwelling and construction of a replacement dwelling
Neil Whicker Electrical Services Ltd The Old Coach Yard 50A Bexwell Road Downham Market DOWNHAM MARKET Norfolk PE38 9LH
Phased Development Including Demolition of Existing Buildings and Construstion of four New Dwellings and Garages
Merilyn 144 Grimston Road South Wootton King's Lynn Norfolk PE30 3PB
Demolition of No.144 Grimston Road and replacement with 2no.dwellings
Land And Outbuildings S of 28 And N of 30 Meadow Way West Lynn King's Lynn Norfolk
Proposed Demolition of two existing garages with the erection of a private detached dwelling and associated works.
1 And 2 Rustons Cottages Rustons Road Marshland St James Norfolk PE14 8ER
Demolition of 2 dwellings and their replacement with 2 detached dwellings
34A Hunstanton Road The Green Heacham Norfolk
Part demolition and alterations to a Grade 2 listed building to create a 3 bedroom dwelling. Permission has already been granted for a 3 bedroom dwelling, application no. 20/01998/F and 20/01999/LB.
43 Norfolk Street King's Lynn Norfolk PE30 1AH
Demolition of Main Roof asbestos cement covering and replacement with clay pan tiles. Demolition of the rear mansard roof and slates, to be replaced with a new first floor structure with vertical walls and a clay pan tile roof. The division of the first floor flat into two flats thus forming an additional dwelling. The removal of the internal staircase, to be replaced with an outside staircase to the first floor. Formation of a bike and bin store to the rear, off Old Sunway.
5 Saturday Market Place King's Lynn Norfolk PE30 5DQ
Construction of dwelling following demolition of outbuilding.
The Smithy Main Road Brancaster Staithe King's Lynn Norfolk PE31 8BJ
Variation of Conditions 1 and 6 of Planning Permission 22/01864/F: Replacement dwelling following partial demolition