102 Lewin Road London Lambeth SW16 6JU
Erection of a single storey ground floor side extension, together with the replacement of rear garage with a single storey outbuilding/office and replacement of boundary fence at the rear.
33 Kirkstall Gardens London SW2 4HR
Erection of a single storey ground floor rear and side extension, the conversion of the garage into a home office space, and landscaping works to the front of the property.
3 Shaftesbury Mews London SW4 9BP
Variation of Condition 2 (approved plans) of planning permission 21/01753/FUL (Erection of a single storey ground floor wrap-around extension and a part two storey side extension, including the conversion of garage into bicycle storage/ home office) granted 19.07.2021. Amendment sought: Adjust the design of the rear extension roof and installation of a front first floor window in the two storey extension
3 Shaftesbury Mews London SW4 9BP
Erection of a single storey ground floor wrap-around extension and a part two storey side extension, including the conversion of garage into bicycle storage/ home office.
Coach House 4 Elms Road London SW4 9EU
Variation of condition 2 (approved plans) and condition 5 (windows and doors) of planning permission ref. 19/04533/VOC Variation of condition 2 (Approved Plans) of planning permission 18/03158/FUL (Erection of an additional storey to the rear, erection of a two-storey rear/side extension and erection of garage) granted on 26.10.2018. Variation sought: to replace drawing number 2207-12 with 2207-12A to extend the approved garage to accommodate a home office.) Granted on 09.03.2020. Variation sought: Alterations to the approved drawings, specifically relating to the windows and doors as approved. Amendments to windows WG.03, WG.04, DG.02 & DG.01 and alterations to windows W1.06 & W1.07 and Door DG.05 made in the detailed design phase to satisfy building regulations of safety edge protection and fire safety.
132 Knight's Hill London SE27 0SR
Erection of extension, removal of garage doors and replacement with windows, and erection of parapet wall to ancillary office/staffroom to existing dental surgery.