Westminster Tower 3 Albert Embankment London SE1 7SP
Application for a non-material amendment following a grant of planning permission ref: 15/03470/VOC (Variation of condition 2 (Approved Plans) of planning permission ref:14/02756/FUL (Refurbishment and conversion of existing building to provide office (B1) accommodation at lower levels, 34 residential units on upper levels, together with ancillary residential accommodation, car and cycle parking and refuse storage) Granted on 19.01.2015 Amendment is sought to remove 11 shared ownership studio units and 742sqm of office accommodation together with minor alterations to the ancillary residential facilities, including a health club and children's play space, parking to the rear and cycle parking in the basement and at ground. No alterations are proposed in respect of the approved external appearance of the building. The affordable housing and office floor space would be relocated into the Spring Mews development on Tinworth Street) granted on 22.04.2016. Amendment sought: Amend description to regularise this with the approved plans and subsequent amendments to the permission.
Westminster Tower 3 Albert Embankment London SE1 7SP
Application for a non-material amendment following a grant of planning permission ref: 15/03470/VOC (Variation of condition 2 (Approved Plans) of planning permission ref:14/02756/FUL (Refurbishment and conversion of existing building to provide office (B1) accommodation at lower levels, 34 residential units on upper levels, together with ancillary residential accommodation, car and cycle parking and refuse storage) granted on 19.01.2015), granted on 22.04.2016. Variation sought: To vary the trigger dates of conditions 4 (materials), 5 (detailed drawings), 6 (landscape and public realm), 7 (hard and soft landscaping), 16 (sound insulation) and 17 (soundproofing) in order to better align these with the proposed development programme and enable works to progress sooner.
Adjoining Borough Observations Within Wandsworth
Observations on a proposed development within the adjoining Borough of Wandsworth with respect to "Demolition of existing two storey plant and telecommunications structure and redevelopment of part of the site to provide a 10 storey building (41.8 metres), plus basement, comprising 5,576 sqm of Class E floorspace, including light industrial use at ground floor level, flexible office floorspace to the 9 upper floors, and ancillary facilities, including a communal roof terrace. Erection of roof extension to existing two storey television studio building (BS1) and conversion of existing double height tv studio to create an energy centre serving the existing and proposed buildings and the installation of new plant. The erection of a single storey building comprising a substation, switch room, waste storage and waste compactor. Alterations to existing plant serving an existing five storey building (BS2). Cycle parking, disabled car parking space and public realm improvements, including landscaping and alterations to pedestrian and cycle access.", at: Battersea Studios, 80 Silverthorne Road, SW8 3HE.
Westminster Tower 3 Albert Embankment London SE1 7SP
Deed of variation to 15/03470/VOC (Variation of condition 2 (Approved Plans) of planning permission ref:14/02756/FUL (Refurbishment and conversion of existing building to provide office (B1) accommodation at lower levels, 34 residential units on upper levels, together with ancillary residential accommodation, car and cycle parking and refuse storage) Granted on 19.01.2015. Amendment is sought to remove 11 shared ownership studio units and 742sqm of office accommodation together with minor alterations to the ancillary residential facilities, including a health club and children's play space, parking to the rear and cycle parking in the basement and at ground. No alterations are proposed in respect of the approved external appearance of the building. The affordable housing and office floor space would be relocated into the Spring Mews development on Tinworth Street.) Amendment proposed: modify the obligation at Schedule 3 of the S106 Agreement such that in place of the provision of off-site affordable housing a financial contribution.