6 Kirklands Road Over Kellet Carnforth Lancashire LA6 1DP
Replacement roof covering and installation of solar panels to rear, alterations to the external materials to the elevations, replacement chimneystack, erection of a dormer window and first floor extension to front and erection of a single storey rear extension
19 - 21 New Street Lancaster Lancashire LA1 1EG
Change of use of mixed use unit comprising of ground floor opticians, first floor offices (class E) and first, second and third floor maisonette (Class C3) to mixed use unit comprising of ground floor retail (class E) and bin/bike store, 1 4-bed maisonette (C4) and 1 3-bed maisonette (C4) on the first, second and third floors, construction of a dormer extension and installation of a roof light to the rear elevation, replacement and repair of windows to the front and replacements doors
19 - 21 New Street Lancaster Lancashire LA1 1EG
Listed building application for the erection of dormer to rear elevation, replacement of windows to front elevation, repairing of windows to the rear elevation, replacement of external doors, installation of roof light to rear elevation, replace pipework, recover flat roof, re pointing of natural stonework, roof finish, leadwork and pointing made to match existing, replace interior partition walls, upgrade historic panel doors, historic stairs floored over. Installation of obscure glazing, raise floor, repairs to fireplace replacement of ceiling, erection of timber handrail and removal of existing plaster rear cottage/ workshop
17 Greenways Over Kellet Carnforth Lancashire LA6 1DE
Construction of dormer extension to rear elevation, a hip to gable roof extension, rooflights to front elevation and alterations to windows
16 Hest Bank Lane Hest Bank Lancaster Lancashire LA2 6DB
Erection of a single storey rear/side extension, installation of raised roof incorporating loft conversion, construction of dormer extensions to the front elevation, installation of first floor rear window and construction of raised patio area with balustrade
16 Hest Bank Lane Hest Bank Lancaster Lancashire LA2 6DB
Erection of a single storey rear/side extension, installation of raised roof incorporating loft conversion, construction of dormer extensions to the front elevation, installation of first floor rear window and construction of raised patio area with balustrade
Boat House Church Brow Halton Lancaster Lancashire LA2 6LR
Conversion of existing detached garage to annex living accommodation, installation of raised roof, construction of dormer extension to the east elevation, installation of glazed gable screen and juliet balcony, new windows and rooflights
Boat House Church Brow Halton Lancaster Lancashire LA2 6LR
Listed building application for the installation of raised roof to existing detached garage, construction of dormer extension to the east elevation, installation of glazed gable screen and juliet balcony, new windows and rooflights
J Wedlake And Son Wheatfield Street Lancaster Lancashire LA1 1UN
Change of use and conversion of existing warehouse (B8) to student accommodation (C3) comprising of 16 1-bed studios, erection of 3-storey side extension, installation of dormer extensions, installation of new window and door openings, installation of rooflights and solar panels to the roof and erection of a 3-storey building for student accommodation comprising 8 1-bed studios with associated plant room and bin store and erection of a bin store and installation of drainage infrastructure (pursuant to the variation of condition 2 on planning permission 20/00964/FUL to amend approved plans by moving position of proposed new 3-storey building away from the North boundary by 925mm)
Derby Home Pathfinders Drive Lancaster Lancashire
Listed building application for the construction of a pitched roof to existing dormer,installation of a rooflight,, replacement rainwater goods, and external vents to the east and west elevations, construction of a new entrance in existing window opening to the side, new window openings to all elevations, removal of doorway opening on the first floor and construction of a new doorway opening and ramp to form new front entrance and construction of internal partition walls, and provision of new slate roofing