Gatehouse Natterjack Lane Middleton Morecambe Lancashire LA3 3FG
Change of use of Gatehouse to mixed use unit compromising office and living accommodation (sui generis), erection of a two storey side extension, single storey rear extension and detached double garage
144 Greaves Road Lancaster Lancashire LA1 4UW
Change of use of lower ground and ground floor offices (Use Class E) to 4 self-contained studio flats (C3) for student accommodation only, removal of garage doors, installation of replacement windows/doors, and installation of railings to the front and rear elevations
13A Brock Street Lancaster Lancashire LA1 1UR
Change of use of first, second and third floor offices (Class E) to 3 self-contained studio flats (Class C3) for student accommodation, construction of a dormer to the rear elevation, installation of a window to the side elevation and construction of a cycle store to the rear
Furness College Tower Avenue Lancaster University Lancaster Lancashire LA1 4YG
Change of use of second floor offices (E) to 7 cluster apartments for student accommodation (Sui Generis) comprising of 1 7-bed, 3 8-bed, 2 9-bed and 1 11-bed and installation of louvers to all elevations
Wennington Institute Bentham Road Wennington Lancashire
Change of use and conversion of the existing village hall to a residential dwelling (C3) including alterations to existing openings, the insertion of new openings and changes to the roof arrangement to provide first floor accommodation, together with an associated access and installation of package treatment plant (pursuant to the variation of condition 2 on planning permission 20/00812/FUL to amend plans in respect of the formation of a single garage in place of study and ground floor front bedroom to dual role as bedroom/office and study)
Site Of Former Sports Centre Farrer Avenue Lancaster University Lancaster Lancashire
Erection of 3-storey teaching, research and technology building (D1) with a roof level plant room and ancillary office accommodation, erection of a bin store, and associated works to create a service access and to re-grade the site (Pursuant to the variation of condition 2 on planning permission 19/00918/FUL to increase parapet height, to alter western, eastern and southern elevation fenestration and to relocate the roof plant enclosure)
14 Queen Street Lancaster Lancashire LA1 1RS
Change of use of office (Class E) into student accommodation (Sui generis) comprising of four 1-bed studios, one 2-bed apartment and two 1-bed apartments, demolition of attached garage and erection of a single storey side extension, formation of ground floor windows/doors to side and rear elevation
Quernmore House Littledale Road Quernmore Lancaster Lancashire LA2 9EN
Change of use of two dwellings (C3) and office (use class E) into one dwelling (C3) including demolition of conservatory and porch, erection of single storey front/side and two storey side extensions, installation of a raised roof and construction of two dormer extensions to the front and one dormer extension to the rear, installation of rooflight windows, conversion of detached building to create two storey ancillary accommodation, erection of detached garage, alterations to land levels, installation of sewage treatment plant and ground source heating system, creation of associated access and parking area
144 Greaves Road Lancaster Lancashire LA1 4UW
Change of use of lower ground and ground floor offices (Use Class E) to 6 self-contained studio flats (C3) for student accommodation only, removal of garage doors, installation of replacement windows/doors, and installation of railings to the front elevation
Ellel Crag Quarry Bay Horse Road Ellel Lancashire
County Council Consultation for a proposed eastern lateral extension to the existing gritstone and shale quarry followed by infilling of the excavation with imported inert waste to be completed by the 30 June 2038, together with the rebuilding and extension of the derelict farmhouse for use as site office accommodation, with the whole of the site to be finally restored by 30 June 2039, or within 12 months from the cessation of landfilling operations, whichever is the sooner