24 Bracken Hill Close Bromley BR1 4AL
T1 Sycamore at front of Flat 28 - Reduce back encroachment from No. 28 and No. 30 to walkway wall line by approximately 1.5-1.8m of branch length. G2 Buddleia & Ivy to side of entrance to Flat 32 - Fell Buddleia to ground level and remove Ivy off building wall. G3 Group of Laurel to the rear of the flats - Reduce back from patio wall to allow approximately 1 - 1.5m clearance. Reduce remainder to match. T4 Laburnum to the rear of the flats - Reduce all round by approximately 0.5 - 1m. Fell stem leaning towards rear elevation of the building. T7 Beech to the front of Flat 20 - Remove 1 x branch overhanging patio area. G9 Mixed trees and shrubs along the rear boundary wall along Highland Road - Cut back overhang from Highlands Road to inner wall line to a height of approximately 4m from ground level. SUBJECT TO TPO BB9 1960
12 Rodway Road Bromley BR1 3JL
Conversion into 7 no self-contained flats. Erection of a 2 storey side and rear extension together with roof alterations comprising rear dormer and rooflights. Extension of the width of 2 no vehicle crossovers and provision of a pedestrian access in the front boundary fronting the highway.
90 London Road Bromley BR1 3RL
Erection of part single storey/part first floor rear extension and rear dormer window, and conversion of dwellinghouse to 3x flats with associated amenity space, boundary fences, cycle storage and bin storage.
Crofton Halls (South) York Rise Orpington
Non-material amendment to planning permission ref: DC/21/02861/FULL1 granted for the erection of new part 2, part 3 storey terraced maisonettes, and 4 storey apartment building, accommodating 35 new dwellings, with associated substation, hard and soft landscaping, and car parking in order to change the design of automatic opening vents (AOVs) within the glazing of the east elevation of the apartment building as well as to update the ground floor site plan to reflect a minor relocation of sheet piling in relation to the western boundary.
90 London Road Bromley BR1 3RL
Erection of rear dormer window, conversion of existing dwellinghouse into 2x 2-bedroom flats, with associated amenity space, boundary fences, cycle storage and bin storage
24 Wheathill Road Penge London SE20 7XH
Conversion of the existing dwelling into 2 x 3 bed flats, single storey rear extension, removal of front boundary wall (facing No.26) and two off-street car parking spaces, new window and secure door to the side elevation, refuse and recycling storage and cycle storage
Oak Cottage 9 Denbridge Road Bickley Bromley BR1 2AG
T2 Dead Chamaecyparis lawsoniana (Lawson cypress) on rear left hand boundary - Dismantle tree in sections to as close to ground level as possible. T3 Tilia (Lime) on rear left hand boundary in neighbouring property (7 Denbridge Road) - Reduce all overhang back to boundary line, making sure to only remove smaller secondary growth. T4 Acer pseudoplatanus (Sycamore) on rear boundary in neighbouring property (Flats at rear of 9 Denbridge Road) - Reduce all overhang back to boundary line, making sure to only remove smaller secondary growth.
The Lodge Southend Road Beckenham BR3 1SE
Demolition of existing building and redevelopment of the site to provide 6 self-contained flats (3 x 1 bedrooms and 3 x 2 bedrooms) (Use Class C3) and associated landscaping, car parking, cycle parking, access and refuse storage. New proposed boundary treatment.
24 Wheathill Road Penge London SE20 7XH
Single storey rear extension, loft conversion with rear dormer extension. Conversion of existing dwellinghouse to 2 x3 bedroom flats. New window and door to ground floor flank elevation. Removal of front boundary wall to facilitate off street parking, refuse and recycling storage and cycle storage.
Bouverie Lodge 4 Rectory Road Beckenham BR3 1TU
Demolition of existing 4th floor, erection of two storey upward extension to create new 4th and 5th floors to provide 8 flats (4 x 1 bed, 2 x 2 bed, 2 x 3 bed) alongside associated works to communal core, new car parking arrangement, cycle and refuse store, new plant room and upgrades to landscaping, hardstanding and boundary treatment.