153 - 155 High Street Penge London SE20 7DS
Change of use of part of ground floor from shop to residential use (associated with reconfiguration to form refuse and cycle store) along with alterations to the shopfront, demolition of part of the first and second floors to form lightwell and conversion of first floor from offices and second/third floors from residential flats to HMO use and enlargement of third floor through construction of extension, with resultant overall first, second and third floor providing 26 bedroom House in Multiple Occupation.
62 - 64 High Street Chislehurst BR7 5AQ
New shopfront to Nos. 62 and 64, conversion of upper floor of No.64 from retail (A3) to residential (C3) with first floor rear extension and 2no. rooflights to form 1x one bedroom and 1x two bedroom flats, and demolition of existing workshop and erection of detached building to rear to form an additional 1x 2 bedroom dwelling.
The Royal Bell 175 High Street Bromley BR1 1NN
Demolition of the former stable block and external steps (173 - 177 High Street), conversion and refurbishment of the former public house including an extension of a 9 storey building plus a basement to provide a 50-bed hotel with a gym, swimming pool and a retail unit (Class A1). Installation of 2 new shopfronts and formation of a new entrance with an associated access to the rear from Walters Yard .