20 Crescent Road Beckenham BR3 6NE
Details submitted to comply with the requirements of the following conditions relating to planning permission ref 23/01568/FULL3 Condition 3- Evidence that the Green Roof has been installed in accordance with part 3(a)
Meycroft 20 Bourne Way Hayes Bromley BR2 7HB
Erection of a one storey roof extension to provide 8 no. flats (7 no. one bedroom and 1 no. two bedroom) and associated works, including new refuse and cycle store. (56 day application under Class A, Part 20, Schedule 2 to the General Permitted Development Order 2015 (as amended) with regards to transport and highways impacts, flooding risk, air traffic and defence assets impacts, contamination risks, external appearance of the building, provision of adequate natural light to habitable rooms and nationally described space standards, impact on residential amenities and protected views).
1 Croydon Road Beckenham BR3 4AA
Prior Approval for the installation of roof mounted Solar PV Panels (56 day application under Class J, Part 14, Schedule 2 of the General Permitted Development Order (as amended)).
50 Palace Grove Bromley BR1 3HB
Erection of a one storey roof extension to provide 2 no. flats and associated works, including new cycle store. (56 day application under Class A, Part 20, Schedule 2 to the General Permitted Development Order 2015 (as amended) with regards to transport and highways impacts, flooding risk, air traffic and defence assets impacts, contamination risks, external appearance of the building, provision of adequate natural light to habitable rooms and nationally described space standards, impact on residential amenities and protected views)
Unicorn House 28 Elmfield Road Bromley BR1 1NX
Installation of Photovoltaic Array to flat roof of Unicorn House consisting of 57no. PV solar panels. (56 day application under Class J, Part 14, Schedule 2 of the General Permitted Development Order to determine whether prior approval is required).
Carlton Court Maple Road Penge London SE20 8EY
Erection of a one storey roof extension to provide 3 no. flats and associated works, including new cycle store. (56 day application under Class A, Part 20, Schedule 2 to the General Permitted Development Order 2015 (as amended) with regards to transport and highways impacts, flooding risk, air traffic and defence assets impacts, contamination risks, external appearance of the building, provision of adequate natural light to habitable rooms and nationally described space standards, impact on residential amenities and protected views)
69 - 71 Church Road Anerley London SE19 2TA
Discharge of conditions in relation to planning application ref 20/04432/FULL1: Condition 7 (ii) - Closure report - details of the remediation works carried out (including of waste materials removed from the site), the quality assurance certificates and details of post-remediation sampling. Condition 7 (iii) Contaminated land assessment, site investigation (including report), remediation works and closure report - details of contractor(s). Condition 15 (c) Evidence of green living roof installation as per approved plans.
Biggin Hill Airport Ltd Churchill Way Biggin Hill TN16 3BN
Consultation under Schedule 2, Part 8 Class F of the General Permitted Development Order 2015, in respect of the alteration of the Bombardier Hangar (to include roof mounted solar panels) on land south of East Camp at Biggin Hill Airport.
Pavilion Leisure Centre Kentish Way Bromley BR1 3EF
Installation of solar panels on western side of roof of the Pavilion Leisure Centre fronting Kentish Way (56 DAY APPLICATION UNDER CLASS J, PART 14, SCHEDULE 2 OF THE GENERAL PERMITTED DEVELOPMENT ORDER TO DETERMINE WHETHER PRIOR APPROVAL IS REQUIRED IN RELATION TO THE DESIGN AND EXTERNAL APPEARANCE OF SOLAR EQUIPMENT ON NON-DOMESTIC PREMISES.
Central Court 1B Knoll Rise Orpington BR6 0JA
Installation of photovoltaic panels onto existing flat roof. (56 day application under Class J, Part 14, Schedule 2 of the General Permitted Development Order to determine whether prior approval is required)