13 The Woodlands Orpington BR6 6HL
Demolition of single storey side extension. Construction of a single storey side extension with the creation of first floor to create two storey dwelling to include alterations to front porch with canopy, solar panels, rooflights to front, rear and left roof slopes, and elevational alterations.
All Saints Catholic School Layhams Road West Wickham BR4 9HN
Variation of Condition 16 planning permission reference 17/02964/MATAMD (dated 5 April 2018 for Amendment to planning permission ref 13/03743/FULL3 granted for the demolition of all school buildings, with the exception of the Reception building, and part demolition of the North Stable block, and erection of 48 dwellings comprising 24x 4-bed houses, 16x 1-bed flats and 8x 2-bed flats and conversion of the stable block into 2x 2-bed residential units, together with 108 car parking spaces. Associated landscaping, hardstanding areas, cycle stores and bin stores. Conversion of existing Reception building to 799sqm of office floorspace (Class b1A) together with 8 dedicated car parking spaces and the construction of 2 tennis courts, designated car park. Erection of pavilion and amenity area for community use. Amendments to position of apartment blocks on the site, extension of apartment blocks at lower ground and upper ground floor levels, demolition of north stable block and erection of 2x 2-bed houses, alterations to proposed housing mix to provide 8x 1-bed and 16x 2-bed apartments, 24x 4-bed houses and 2x 2-bed houses, alterations to windows, doors and internal layout of House Types B and C, amendments to car parking, maintenance access to Wickham Court School, removal of pavilion and internal landscaping and footpaths. Discharge of condition 16 (layout of wheelchair units) for planning permission reference 13/03743/FULL3) to allow for Plot 30 to be built to wheelchair adaptable Building Regulations Part M4(2) rather than wheelchair user Building Regulations Part M4(3).
7 Ashbourne Rise Orpington BR6 9PY
Loft conversion and alterations to existing dwelling. 2 storey side extension to create a new dwelling, associated parking, vehicle access and external storage.
7 Woodside Road Bickley Bromley BR1 2ES
Addition of first floor to create two storey dwellinghouse, single storey front extension, single storey rear extension with roof terrace and balustrade, two storey side extension, loft conversion including rear dormer with front and side roof lights, elevational alterations.
95 Towncourt Lane Petts Wood Orpington BR5 1EL
The conversion of a detached single storey dwelling house into a pair of semi-detached dwelling houses, including front, side and rear single storey extensions, roof alterations to include increase in ridge height, loft conversions with rear dormers and two Juliet balconies, two front roof lights and elevational alterations
203B High Street Penge London SE20 7PF
Construction of side dormer extension with first and second floor rear extensions, with conversion of resultant first floor from single dwelling to 2 no. studio flats, and conversion of resultant second floor from single flat to a 4 bedroom HMO.
56 Shortlands Road Shortlands Bromley BR2 0JP
Proposed upward extension and conversion of an existing garage building into a one bedroom dwellinghouse.
13 The Woodlands Orpington BR6 6HL
Single storey rear extension and creation of first floor to create two storey dwelling to include enlargement of front porch, solar panels and rooflights to front, rear and left roof slopes, and elevational alterations.
11 Lewes Road Bromley BR1 2RN
Conversion of dwellinghouse into two flats, part one/two storey rear extension, roof alterations including loft conversion with rear dormer and three front roof lights.
Home Farm Kemnal Road Chislehurst BR7 6LY
Demolition of part of Greenacres , demolition of Polo Mews North, demolition of Polo Mews South and demolition of part of The Bothy. Erection of linking extension between Polo Mews North and Polo Mews South. Erection of a two storey extension to The Bothy. Establishment of new vineyard. Provision of new solar panel array. Erection of hydrogen energy plant and equipment. Erection of new single storey dwelling. Rearrangement of the internal access roads.