7 -13 Coombe Road Kingston Upon Thames KT2 7AB
Details required for Condition 4a (window and door details, including reveal) of planning permission 22/02111/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 2 (Approved Plans) of Planning Permission ref: 17/12114/FUL (Demolition of existing retail building and dwellings and erection of a part three-part four storey building to provide 5 x 2 bedroom apartments and 26 serviced apartments with rear parking) dated 29/01/2019. Variation to include changes to facade, internal layout, refuse and storage facilities, changes to floor areas and reprovision of PV panels of the roof)
322 -324 Hook Rise North Tolworth KT6 7LN
Erection of 3 additional storeys with accommodation in mansard roof to form 8no. x one bedroom flats and 2no. ground floor retail units with associated refuse/recycling provision and cycle storage (revised details)
7-13 Coombe Road Kingston Upon Thames
Details required for Condition 11 (Levels of building, roads, parking areas and pathways) of planning permission 22/02111/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 2 (Approved Plans) of Planning Permission ref: 17/12114/FUL (Demolition of existing retail building and dwellings and erection of a part three-part four storey building to provide 5 x 2 bedroom apartments and 26 serviced apartments with rear parking) dated 29/01/2019. Variation to include changes to facade, internal layout, refuse and storage facilities, changes to floor areas and reprovision of PV panels of the roof)
11 Coombe Road Kingston Upon Thames
Details of Condition 23 (Drainage Design) of Planning Permission ref: 17/12114/FUL (Demolition of existing retail building and dwellings and erection of a part three-part four storey building to provide 5 x 2 bedroom apartments and 26 serviced apartments with rear parking)
7-13 Coombe Road Kingston Upon Thames
Details required for Condition 6 (Secured by Design Scheme) of planning permission 22/02111/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 2 (Approved Plans) of Planning Permission ref: 17/12114/FUL (Demolition of existing retail building and dwellings and erection of a part three-part four storey building to provide 5 x 2 bedroom apartments and 26 serviced apartments with rear parking) dated 29/01/2019. Variation to include changes to facade, internal layout, refuse and storage facilities, changes to floor areas and reprovision of PV panels of the roof).
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for Conditions 19 (Co2 & Water) of planning permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts)
7-13 Coombe Road Kingston Upon Thames
Details required for Condition 3 (Sample of Facing materials) of planning permission 22/02111/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 2 (Approved Plans) of Planning Permission ref: 17/12114/FUL (Demolition of existing retail building and dwellings and erection of a part three-part four storey building to provide 5 x 2 bedroom apartments and 26 serviced apartments with rear parking) dated 29/01/2019. Variation to include changes to facade, internal layout, refuse and storage facilities, changes to floor areas and reprovision of PV panels of the roof)
7-13 Coombe Road Kingston Upon Thames
Details required for Condition 19 (Hard and Soft Landscaping Scheme and green Roofs) of planning permission 22/02111/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 2 (Approved Plans) of Planning Permission ref: 17/12114/FUL (Demolition of existing retail building and dwellings and erection of a part three-part four storey building to provide 5 x 2 bedroom apartments and 26 serviced apartments with rear parking) dated 29/01/2019. Variation to include changes to facade, internal layout, refuse and storage facilities, changes to floor areas and reprovision of PV panels of the roof)
The Fountain 120 Malden Road New Malden KT3 6DD
Application under Section 73A of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 1 (Approved Plans) of Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Variation to include introduction of automatic opening vent, amendments to layout of Ground Floor Block B and changes to balustrades and balconies of Block B.
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for Conditions 13 (Part M4 (2)) and 18 (Sustainable Drainage) of planning permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts)