Hawks Road Clinic Hawks Road Kingston Upon Thames KT1 3EW
Discharge of Obligation relating to 22/01359/FUL. Schedule 1 (Notices and Monitoring) Section 2.3 Not to Commence the Development (including any works of demolition) until a Construction Logistics Plan has been submitted and approved in writing by the Council.
Development Site At 37 Derwent Avenue Kingston Vale SW15 3RA
Details required for Conditions 5 (Cycle Parking), 6 (Construction Management Plan), 10 (Landscaping Scheme) and 16 (Fire Safety Strategy) of planning permission 23/01536/FUL (Variation of Condition Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 1 (Approved Plans) of Planning permission 22/00304/FUL (Erection of two storey single family dwelling with roof accommodation and basement with associated amenity space, off street parking, perimetre wall, electric access gates, cycle storage and refuse/recycling store) to allow minor modifications on approved plans and elevations.)
The Worcester Park Tavern Park Terrace Worcester Park KT4 7JZ
Details required for Condition 6 (Construction Management Plan) of planning permission 19/00330/FUL (Erection of five/six storey building for 132 bedroom hotel with meeting room, bar/restaurant and ground floor external terrace, car park and landscaping, together with the reconfiguration of Park Terrace.)
The Worcester Park Tavern Park Terrace Worcester Park KT4 7JZ
Details required for Condition 05 (Construction Logistics Management Plan) of Planning Permission ref: 19/00330/FUL (Erection of five/six storey building for 132 bedroom hotel with meeting room, bar/restaurant and ground floor external terrace, car park and landscaping, together with the reconfiguration of Park Terrace)
15 Brook Gardens Kingston Upon Thames KT2 7ET
Details required for Condition 6 (Construction Management Plan), 17 (Drainage Scheme) & 19 (Foul water scheme details) of Planning Permission ref: 22/02422/FUL (Erection of new dwelling house to rear of 15 Brook Gardens with associated landscaping, cycle storage and alteration to existing coach house.)
Ground Floor 81 - 83 Victoria Road Surbiton KT6 4NS
Details required for Condition 4 (Waste and Recycling), 5 (Cycle Parking), 6 (Construction Management Plan) & 7 (Fire Safety Strategy) of Planning Permission ref: 23/01002/FUL (Subdivision of existing ground floor unit into 2nos retail units/shopfront and signage replacement above shopfront entrances)
15 - 23 Fife Road Kingston Upon Thames KT1 1SB
Details required for Condition 9 (Construction Environmental Management Plan) and 34 (Waste Management Strategy) of planning permission 22/03680/FUL.
Former Cricket Pavilion Land Adjacent To 6 And 7 Barton Green New Malden KT3 3HU
Details required for Condition 4 (Construction Management Plan) of planning permission 23/01699/FUL (Erection of a three storey residential building housing 5nos. new dwellings with associated cycle and bin access.)
24 Adelaide Road Surbiton KT6 4SS
Details required for conditions 9 (Construction Management Plan) and 22 (BNG) of planning permission 22/00574/FUL Demolition of existing block of 5no.x garages and erection of a new 3 bed 5 person detached dwelling with associated amenity space, parking, cycle and refuse storage.
15 - 23 Fife Road Kingston Upon Thames KT1 1SB
Details required for Condition 8 (odour from fixed plant and equipment) and 10 (biodiversity protection and enhancement) of planning permission 22/03680/FUL(Variation of Condition Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with condition 2 (Approved Plans) of Planning Permission ref: 20/00945/FUL (Demolition of the existing buildings on site and the erection of a part-seven, part-nine storey building plus basement to provide co-living accommodation (use class sui generis) and a restaurant (use class A3), together with associated and ancillary facilities, access and servicing, parking and landscaping arrangements) to allow minor non-material amendments arising from detailed construction stage design in order to meet current Building Regulations and Fire Regulations.