Courtlands 2 Langley Grove New Malden KT3 3AL
Details required for Condition 5 (Fire Safety Strategy) of planning permission 22/03034/HOU (Partial demolition and remodelling of existing ground floor rear extension and rear elevation; Alterations to side elevations fenestration and alteration of side elevation bay; Alterations to ground floor front elevations porch and roof form and first floor bay; Demolition of 2no chimneys; Replacement of all existing windows; Replacement of existing roof tiles; Demolition of existing front boundary wall and fence to be replaced with raised painted render boundary wall and Cedar panel and wooden slats gate)
Kingston Business Centre Fullers Way South Chessington KT9 1DQ
Details required for Condition 4 (Samples) of planning permission 22/03204/FUL (External alterations to the existing units including the installation of roof overlay and external lighting, along with the erection of a fence and associated works).
42 Matlock Way New Malden KT3 3AY
Approval of Planning Condition 7 (Positions, Design, Materials and Type of all gates, Boundary Treatment, Fences and Means of Enclosures), 8 (Landscaping Scheme) and 10 (Cycle Facilities) of Planning Permission ref: 19/03124/FUL (Demolition of existing bungalow and erection of two storey dwelling with accommodation in roof space)
Orchard House Kingston Vale London SW15 3RN
Details required for Condition 5 (Green Roof) of planning permission 21/03266/HOU (Partial demolition of existing single-storey rear extension with erection of new single-storey rear extension and associated changes to fenestration. Render to first floor front elevation. New boundary fence/wall and gate to front. Landscaping to front courtyard. Installation of new Solar Panels and air source heat pump)
Orchard House Kingston Vale London SW15 3RN
Details required by Condition 5 (Manufacturers Details of Living Roof) of Planning Permission 21/03266/HOU (Partial demolition of existing single-storey rear extension with erection of new single-storey rear extension and associated changes to fenestration. Render to first floor front elevation. New boundary fence/wall and gate to front. Landscaping to front courtyard. Installation of new Solar Panels and air source heat pump)