The Fountain 120 Malden Road New Malden KT3 6DD
Application under Section 73A of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 1 (Approved Plans) of Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Variation to include introduction of automatic opening vent, amendments to layout of Ground Floor Block B and changes to balustrades and balconies of Block B.
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for Conditions 13 (Part M4 (2)) and 18 (Sustainable Drainage) of planning permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts)
38 Crescent Road Kingston Riding Centre KT2 7RG
Details required for Condition 9 (Evidence of C02 reductions and internal water usage) of planning permission 19/02455/FUL (Demolition of the existing riding school buildings and the erection of 2x Blocks to accommodate 52 No. residential apartments, with associated car parking and landscaping and provision of electricity substation.)
Land Rear Of 3-4 Oaklea Passage Kingston Upon Thames KT1 2AJ
Demolition of existing garage and erection of a new residential building housing a mix of 7nos flats with associated parking, bins and cycle provision.
Garages Opposite 81 To 85 Alfred Road Kingston Upon Thames
Demolition of existing garages and erection of two storey apartment building consisting 3no residential dwellings (Use Class C3).
Perak Court Elmbridge Avenue Surbiton KT5 9EU
Erection of 2 additional storeys to existing block of flats to create 10no. self-contained residential units
Adams House Dickerage Lane New Malden KT3 3SQ
Demolition of an existing office building and erection of a new residential building providing 22nos flats, associated landscaping and cycle storage.
65 Hampden Road Kingston Upon Thames KT1 3HG
Non Material Amendment to planning permission 20/02014/FUL (Application under Section 73 for a variation of Condition 2 (Approved Plans) of Planning Permission ref: 19/00020/FUL (Demolition of existing industrial buildings and erection of replacement residential accommodation containing 79 flats, comprising of 1, 2, 3 and 4 bedroom units, a Police Office, Use Class B1 (a), residents work hub incorporating 47 car parking spaces, 184 private cycle parking spaces and 6 public cycle spaces and refuse, recycling and plant stores, a private and communal amenity spaces, play space and hard/soft landscaping) dated 23/01/2020, to allow for alterations to internal/external configurations to lower ground, upper ground, first to fifth and roof floors) for the variation of conditions 1, 10, 11, 17, 28 to include phasing plan within the extant approved conditions and to adjust the timing for submission of details and alterations of the description of development to include reference to phasing.
65 Hampden Road Kingston Upon Thames KT1 3HG
Details required for Condition 48 (Construction Management Plan) of planning permission 20/02014/FUL (Application under Section 73 for a variation of Condition 2 (Approved Plans) of Planning Permission ref: 19/00020/FUL (Demolition of existing industrial buildings and erection of replacement residential accommodation containing 79 flats, comprising of 1, 2, 3 and 4 bedroom units, a Police Office, Use Class B1 (a), residents work hub incorporating 47 car parking spaces, 184 private cycle parking spaces and 6 public cycle spaces and refuse, recycling and plant stores, a private and communal amenity spaces, play space and hard/soft landscaping) dated 23/01/2020, to allow for alterations to internal/external configurations to lower ground, upper ground, first to fifth and roof floors).
65 Hampden Road Kingston Upon Thames KT1 3HG
Details required for Conditions 10 (Construction Logistics Plan/Statement) and 11 (Construction Management Plan) of Planning Permission 20/02014/FUL (Application under Section 73 for a variation of Condition 2 (Approved Plans) of Planning Permission ref: 19/00020/FUL (Demolition of existing industrial buildings and erection of replacement residential accommodation containing 79 flats, comprising of 1, 2, 3 and 4 bedroom units, a Police Office, Use Class B1 (a), residents work hub incorporating 47 car parking spaces, 184 private cycle parking spaces and 6 public cycle spaces and refuse, recycling and plant stores, a private and communal amenity spaces, play space and hard/soft landscaping) dated 23/01/2020, to allow for alterations to internal/external configurations to lower ground, upper ground, first to fifth and roof floors.)