74 Tolworth Road Tolworth Surbiton KT6 7SZ
Details required for Conditions 6 (Nature Conservation) and 7 (Landscaping Scheme) of planning permission 23/00028/FUL (Proposed raising of roof height and installation of dormers to provide additional accommodation in roof of existing dwelling and erection of two storey side extension (following demolition of existing single storey extension and outbuilding) to create an additional dwelling with associated off street parking, refuse/recycling store and cycle store)
42 Matlock Way New Malden KT3 3AY
Details required for Conditions 7 (Boundary Treatment), 8 (Landscaping Scheme) and 10 (Cycle Facilities) of Planning Permission ref: 19/03124/FUL (Demolition of existing bungalow and erection of two storey dwelling with accommodation in roof space).
28 Revell Road Kingston Upon Thames KT1 3SW
Variation of Condition Application under Section 73A of the Town and Country Planning Act 1990 to carry out development without compliance with condition1 (Approved Plans) of Planning Permission 22/02378/HOU (Demolition of existing rear extension, conversion of garage into habitable space, erection of two-storey side, part two storey/part single storey rear extension. Erection of roof extension with rear/ side dormer and rear juliet balcony and installation of 2 nos front rooflights to facilitate loft conversion. Internal alterations and associated rear landscaping.) to include a fully recessed balcony.
7-13 Coombe Road Kingston Upon Thames
Details required for Condition 19 (Hard and Soft Landscaping Scheme and green Roofs) of planning permission 22/02111/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 2 (Approved Plans) of Planning Permission ref: 17/12114/FUL (Demolition of existing retail building and dwellings and erection of a part three-part four storey building to provide 5 x 2 bedroom apartments and 26 serviced apartments with rear parking) dated 29/01/2019. Variation to include changes to facade, internal layout, refuse and storage facilities, changes to floor areas and reprovision of PV panels of the roof)
17-19 Dukes Avenue New Malden Kingston Upon Thames KT3 4HL
Details required for Conditions 4 (Openings/Windows), 7 (Landscaping and Planting Scheme), 8 (Construction Logistics Plan), 9 (Refuse and Recycling), 12 (Noise Insulation),13 (Environmental Construction Management Plan), and 14 (Contaminated Land Assessment) of planning permission 17/14193/FUL (Change of use of site from car sales to residential use. Erection of part single/ part two/ part three storey building for use as nine self-contained flats with roof terraces/ amenity space and cycle parking provision)
Glanmire Farm Rushett Lane Malden Rushett Chessington Kingston Upon Thames KT18 7TR
Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 2 (Approved Plans) of planning permission 21/04089/FUL (APPZ5630/W/22/3300875) (Demolition of existing stables and barn, erection of a single storey dwelling and replacement detached stable with associated parking and landscaping. Variation to include 21 integrated PV panels on the southern roof slope, alterations to fenestration, and erection of a muck heap storage area.
8 Dutch Gardens Kingston Upon Thames KT2 7TT
Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 3 (Materials) for Application Reference Number: 22/03071/HOU (Demolition of existing garage, erection of part single, two storey side extension and basement extension. Erection of rear gable and dormer roof extension with installation of 1no front rooflight to facilitate loft conversion. Alteration to fenestration and porch. Landscaping to front and rear). Variation to consist of changes to external materials
391 Ewell Road Surbiton KT6 7DG
Erection of two-storey rear extension, roof extension with rear dormer and installation of 2nos front, 2nos side and 1no rear roof lights to facilitate loft conversion. Conversion of single dwelling to 3nos self-contained flats (1 x 3-bedroom 4 person, 1 x 2-bedroom 3 person, and 1 x 1-bedroom 1 person), associated fenestration and entrance door, along with landscaping, parking, cycle and refuse storage.
The Fountain 120 Malden Road New Malden KT3 6DD
Application under Section 73A of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 1 (Approved Plans) of Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Variation to include introduction of automatic opening vent, amendments to layout of Ground Floor Block B and changes to balustrades and balconies of Block B.
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for Conditions 13 (Part M4 (2)) and 18 (Sustainable Drainage) of planning permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts)