22 - 36 Hastings Street Luton LU1 5BE
Development of land for residential purposes - Demolition of existing building and erection of a new residential block consisting of 5 two bed and 13 one bed flats. Discharge of conditions 3 (Management plan) and 9 (scheme for site security and external lighting) 23/00025/MMAMD 21st April 2023 Minor Material Amendment of Planning Permission 14/01182/FUL dated 12th February 2015. (partially raising the eaves and ridge height of the building, re-configuring the roof, erecting dormer windows, altering fenestration and installing AOVs and soil vent pipes)(Retrospective).
95 Park Street Luton LU1 3HG
Erection of three storey rear extension and conversion of existing first floor and loft to provide 5 dwellings (3 x 4 person two-bedroom flats and 2 x 3 person two-bedroom flats) with 2 new front dormer windows to facilitate loft conversion and retention of existing ground floor shop.
37 - 39 Castle Street Luton LU1 3AZ
Erection of a 4, 9 and 11 storey building comprising 67 flats with associated car parking, cycle and refuse store, landscaping and access after demolition of existing building. Non-Material Amendment of planning permission 18/01294/FUL dated 1st April 2019. (remove some Juliet balcony balustrades, changes in some external materials, repositioning of some windows and doors, minor external and internal changes)
Flat B & Flat C 221 Hitchin Road Luton LU2 7SL
Erection of single storey and first floor rear extensions to enlarge the ground and first floor rear flats and alteration to fenestration
11 - 15 High Town Road Luton LU2 0BW
Conversion and change of use of first floor and part-ground floor from ancillary storage (Class A1) to 4 flats ( 1x one bedroom, 2 x two bedroom and 1x three one-bedroom flats) (Class C3) and associated storage, erection of first floor rear extension and external alterations to fenestration details and shopfront. Discharge of condition 4 ( management plan) of planning permission 19/00825/FUL dated 17th June 2019.
35 - 37 Wellington Street Luton LU1 2QH
Change of use and conversion of upper floors of the existing building to provide 3 flats ( 1 three bed, 1 two bed & a studio) with the addition of rear dormers, 2 rear rooflights and alterations to rear fenestration with associated cycle storage and amenity space for Flat 1. Discharge of Condition 6 (Ventilation and odour control systems) of Planning permission 22/00749/FUL dated 22nd September 2022.
137 Morgan Close Luton LU4 9GN
Conversion and change of use of the existing House in Multiple Occupation (Class C4) to 2 two-bedroom flats and 1 one-bedroom flat, including erection of a part single, part two storeys rear extension and erection of front and rear dormer windows. Discharge of conditions 4 (management plan), 7 (refuse & recycling management plan), 11 (Construction Method Plan(CMP)) and 13 (boundary treatment) of planning permission 20/00657/FUL dated 7th August 2020.
Lawrence Hall 40 - 46 John Street Luton
Conversion and change of use of former student accommodation and erection of fourth and recessed fifth floor roof/rear extensions to create 28 flats (14 two-bedroom and 14 one-bedroom) with roof garden, together with installation of solar panels, fenestration alterations, hard/soft landscaping and associated works.
11 - 15 High Town Road Luton LU2 0BW
Conversion and change of use of first floor and part-ground floor from ancillary storage (Class A1) to 4 flats ( 1x one bedroom, 2 x two bedroom and 1x three one-bedroom flats) (Class C3) and associated storage, erection of first floor rear extension and external alterations to fenestration details and shopfront. Discharge of Condition no. 8 (Shopfront alterations) of planning permission 19/00825/FUL dated 21st November 2019.
22 - 36 Hastings Street Luton LU1 5BE
Development of land for residential purposes - Demolition of existing building and erection of a new residential block consisting of 5 two bed and 13 one bed flats. Minor Material Amendment of Planning Permission 14/01182/FUL dated 12th February 2015. (partially raising the eaves and ridge height of the building, re-configuring the roof, erecting dormer windows, altering fenestration and installing AOVs and soil vent pipes)(Retrospective).