21 Station Road Headcorn Kent TN27 9SB
Lawful Development Certificate (Proposed) for erection of replacement boundary fence, installation of hard surfaces and construction of a building for incidental use.
Abbey Wharf Standard Quay Faversham Kent ME13 7BS
Submission of details pursuant to Condition 1: Three years, Condition 2: In accordance to the approved plans, Condition 3: Sustainable construction techniques statement, Condition 4: Drainage and Foundation and Drainage Design strategy document, Condition 5: Geo-environmental strategy document, Condition 6: Material Samples, Condition 7: Hard surfacing, Condition 8: Boundary wall detailed drawing, Condition 9: details of the colour finishes for all external joinery (including weatherboarding), Condition 10: windows and doors details documents/drawings, Condition 11: Construction details, Condition 12: Landscaping, Condition 13: Surfacing and site levels, Condition 14: Foundation and Drainage Design strategy document and Geo-environmental strategy document, Condition 15: Work Times, Condition 16: Hard and Soft Landscape Works, Condition 20: Remediation Strategy, Condition 21: Five Year Planting, Condition 26: Retractable Bollards for planning permission 16/508709/FULL.
Timberden Boxley Road Maidstone Kent ME14 2DT
Submission of details pursuant to conditions 3 (details of materials), 4 (fencing, walling, other boundary treatments), 5 (landscape scheme), 9 (biodiversity enhancment scheme), 10 (construction management plan), 11 (details of earthworks), 13 (external lighting), 14 (decentralised, renewable, or low-carbon energy source details), and 15 (arboricultural method statement) of application 21/502269/FULL.
The Meadows Maidstone Road Nettlestead Kent ME18 5HE
Submission of details pursuant to conditions: 2 (Construction Management Plan); 3 (contamination); 5 (materials); 6 (boundary treatments); 7 (landscaping); 9 (biodiversity enhancements); 10 (drainage); and 11 (external lighting) for 21/504555/FULL.
HMP Standford Hill Church Road Eastchurch Kent ME12 4AA
Screening Opinion for the construction of two houseblocks (two storeys) for a total of 120 prisoners, a proposed record store, library, office and extension to the existing visitor car park (40 spaces) within boundary of HMP Standford Hill Category D Prison. The proposed development falls within Schedule 2 of the EIA Regulations 2017 (Schedule 2, 10 (b)) Urban Development Projects.
Sychar North Pole Road Barming Maidstone Kent ME16 9HH
Demolition of existing garage with construction of replacement car port. Construction of new front boundary wall, extended driveway and entrance gate
Land To The East Of Hermitage Lane Maidstone Kent
Submission of Details to Discharge Condition 10 (Phase 3 Boundary) - Details of trees to be retained on that phase and of the measures to be taken for their protection during construction subject to 13/1749 (APP/U2235/A/14/2226326).
Plot 3 Maidstone Innovation Centre Gidds Pond Way Weavering Kent ME14 5FY
Non Material Amendment Being - Landscaping Changes to include the following: - Correction of the site boundary - Removal of the steps and ramp to the front entrance to avoid any construction within the service margin outside the site boundary and any undermining of the service margin - Realignment of the gabion retaining wall in front of the main entrance - Extension of the path outside the site boundary at the crossover - Addition of tactile paving either side of the crossover - Addition of a GRP sub-station that is 6m away from the building and within 20m of the intake room - Addition of a hedge/screen on two sides of the sub-station - Slight adjustment to the turning head to allow the UKPN vehicle to turn - Removal of 3 parking spaces to accommodate the sub-station and screen planting - Inclusion of car parking charging points - Post & wire fence. Subject to 18/506658/REM
Downs View Farm Pilgrims Way Boxley ME14 3EB
Submission of details pursuant to condition 2 (details of a sustainable surface water drainage scheme), condition 3 (samples of materials (which shall include those to be used for parking, turning and pedestrian walkways) to be used in the construction of all external surfaces of the development), condition 4 (landscaping scheme) and condition 18 (details of boundary treatments) in relation to planning permission 19/503943/FULL.
Walnut Oast Barming Maidstone Kent ME16 9NH
Submission of details pursuant to conditions 2 (details of proposed slab levels and existing site levels), 3 (details of materials), 4 (decentralised and renewable or low-carbon sources of energy), 5 (electric vehicle charging point), 6 (boundary treatments), 8 (arboricultural method statement), 9 (landscaping scheme), 13 (sustainable drainage scheme), 14 (on-site parking and turning for construction traffic), 15 (refuse and cycle storage details), and 16 (biodiversity enhancement scheme), of application 19/500169/FULL.