Stone Orchard Barn Stone Farm Lower Road Buckland Kent ME13 0TW
Lawful Development Certificate (Proposed) for alterations to fenestration and construction of porch to front elevation.
56 Manor Grove Sittingbourne Kent ME10 1LS
Lawful Development Certificate for proposed conversion of the loft into habitable space including the construction of a rear dormer and a hip to gable roof.
14 Kings Acre Downswood Maidstone Kent ME15 8UP
Lawful Development Certificate for the proposed removal of a conservatory and the construction of a singe storey rear extension.
The Yard Hermitage Lane Boughton Monchelsea Maidstone Kent ME17 4DA
Certificate of lawful development (existing) for the construction of part of the foundations of 4no. dwellings approved under: 18/503404/FULL.
Oak House 18 Forge Lane Headcorn Ashford Kent TN27 9QH
Lawful Development Certificate (Proposed) for the removal of the existing conservatory and construction of a garden room.
130 Ashford Road Bearsted Maidstone Kent ME14 4AF
Lawful Development Certificate (Existing) for the commencement of the construction works at 130 Ashford Road in accordance with planning permission 19/506137/FULL has been made thus constituting an effective start.
Church Farm, Unit 7 Collier Street Tonbridge TN12 9RT
Lawful Development Certificate for a proposed outbuilding with B8 storage and distribution use with the construction of an access track.
Stone Orchard Barn Stone Farm Lower Road Buckland Kent ME13 0TW
Lawful Development Certificate for proposed alterations to fenestration and construction of porch to front elevation.
Little Newstead Barn Couchman Green Lane Staplehurst Tonbridge Kent TN12 0RT
Lawful Development Certificate (Existing) for change of use of agricultural land to equine, including formation of sand school/riding arena; and construction of hay barn, stables and shed/tack room as described in planning application reference: 21/503868/LDCEX.
26 Albany Street Maidstone Kent ME14 5AJ
Lawful Development Certificate for the proposed conversion of existing loft space and construction of rear dormer and rooflights on front elevation