The Friary Carmelite Way Maldon Essex CM9 5FJ
Compliance with conditions notification 17/00764/LBC (Residential redevelopment for 28 dwellings comprising conversion of listed building to 7 apartments, demolition of unsympathetic 1960s extension and replacement with 2 townhouses, construction of new build development within the grounds to the south comprising 19 apartments, hard and soft landscaping and associated parking and infrastructure.) Condition 2 - Demolition Method Statement, 7 - Glazed Screens and 8 - Boundary Wall
Land West Of Bridgemans Green Latchingdon Essex
Compliance with conditions notification of approved application 15/00396/OUT (Erect 52 detached, semi-detached and terraced dwellings and flats, lay out parking, amenity areas, estate roads, footpaths and landscaping) Condition 14 - Construction method statement (Revision to that approved under 21/05030/DET).
Land North West Of 2 Maldon Road Burnham-On-Crouch Essex
Variation of conditions 15 (site access construction),16, (site access layout), 17 (new footpaths) and 31 (approved drawings) on approved planning permission 18/00443/OUT ( Create retirement community consisting of 103No. one, two and three-bedroom bungalows (class C.3), 70 bedroom two-storey care home building (class C.2) and 55 bedroom two-storey assisted living apartment building (class C.3) including affordable housing. Erect ancillary community centre, 8No. shops (class A.1) with 8No. key workers apartments over in two-storey building, two-storey medical centre (GP, dental, optician, and dispensing chemist), and construct single-storey office and Maintenance Buildings. Lay Out Amenity and Sports Facilities Including Outdoor Swimming Pool, tennis courts, allotments and open spaces. Lay out estate roads, footpaths and surface water drainage infrastructure including swales and detention Basin. Form vehicular and pedestrian accesses onto B1010 Maldon Road and Tinkers Hole, and create associated hard and soft landscaping) (as amended by 22/00807/NMA) to accommodate amendment to site access
Land North Of Marsh Road Burnham-On-Crouch Essex
Application for non-material amendment following grant of Planning Permission 19/01208/FUL (Residential development comprising the construction of 90 residential dwellings (Use Class C3), public open space, landscaping and associated infrastructure. Amendment sought: Changes to the south-east section of the approved development, specifically re-locating the block of flats slightly further south and associated changes.
Drakkar Wharf The Square Heybridge Essex
Change of use and associated construction works to create two apartments on the ground floor of the existing building.
The Dengie Project Trust Knightswood Centre Steeple Road Southminster Essex CM0 7BD
Conversion of 2No. existing buildings (previous use class C2) into 11 flats and 2 maisonettes and the construction of 3 new bungalows to rear.
Land North West Of 2 Maldon Road Burnham-on-crouch Essex
Compliance with conditions notification 18/00443/OUT (Create retirement community consisting of 103No. one, two and three-bedroom bungalows (class C.3), 70 bedroom two-storey care home building (class C.2) and 55 bedroom two-storey assisted living apartment building (class C.3) including affordable housing. Erect ancillary community centre, 8No. shops (class A.1) with 8No. key workers apartments over in two-storey building, two-storey medical centre (GP, dental, optician, and dispensing chemist), and construct single-storey office and Maintenance Buildings. Lay Out Amenity and Sports Facilities Including Outdoor Swimming Pool, tennis courts, allotments and open spaces. Lay out estate roads, footpaths and surface water drainage infrastructure including swales and detention Basin. Form vehicular and pedestrian accesses onto B1010 Maldon Road and Tinkers Hole, and create associated hard and soft landscaping) Condition 14 - Construction method statement.
Mill Beach Public House Goldhanger Road Heybridge Essex CM9 4RA
Compliance with conditions notification 20/01216/FUL (Removal of condition 5 and variation of conditions 2 and 6 on approved planning application 19/01164/FUL (Demolition of existing and erection of a replacement public house (class A4), with a first-floor apartment, and change of use of land for the siting of 12 holiday lodge caravans.)) Condition 19 - Construction method statement. Condition 35 - Ecology construction method statement.
Tower Mews High Street Maldon Essex
Compliance with conditions notification 15/00983/FUL (Proposed 1 x two bed and 2 x one bed apartments) Condition 3 - Construction method statement. Condition 6 - Hard & soft landscape works. Condition 9 - Surface water drainage. Condition 10 - Foul drainage.
Land West Of Bridgemans Green Latchingdon Essex
Compliance with conditions notification 15/00396/OUT (Erect 52 detached, semi-detached and terraced dwellings and flats, lay out parking, amenity areas, estate roads, footpaths and landscaping) Condition 14 - Construction method statement. Condition 28 - External lighting. Condition 29 - Nature and contamination site investigation.