Solar Farm At 596892 196989 Marsh Road Burnham-On-Crouch Essex
EIA Screening Opinion request for construction and operation of a solar farm together with all associated works, equipment and necessary infrastructure and ancillary battery storage.
Hall Farm Land At 583941 203977 Hazeleigh Hall Lane Hazeleigh Essex
Variation of condition 4 on approved planning permission 22/00261/FUL ( The construction and operation of a solar photovoltaic farm and associated infrastructure, including inverters, security cameras, fencing, access tracks and landscaping.)
The Essex Wildlife Trust Nature Reserve Blue House Farm Blue House Farm Chase North Fambridge Essex CM3 6GU
Variation of condition 14 (timing of construction works) on approved planning permission 20/00638/FUL (Construction of an earth bund measuring 2,140m around the perimeter of the site (0.5m high and 4m wide) and approximately 3000m of foot drains/ditches around the site and through the site (3m wide and 0.5m deep). Twelve shallow scrapes approximately 2,500m2 each with a maximum depth of 0.5m. Break-up agricultural land drains at the edge of the site. Construction of concrete, boarded sluice.)
Cobbs Farm Maldon Road Goldhanger Essex CM9 8BQ
Continuation of use of a washing plant for processing of indigenous sand and gravel obtained from the construction of an agricultural reservoir without compliance with Conditions 3 (cessation and restoration by 20th May 2020) and 4 (removal of plant and machinery by 20th May 2020 attached to planning permission ref ESS/03/19/MAL, to allow additional time for completion and restoration of the development by 30th September 2021
Cobbs Farm Maldon Road Goldhanger Essex CM9 8BQ
Continuation of the construction of an agricultural reservoir by the extraction and removal from the site of sand, gravel and surplus soils, without compliance with Conditions 3 (cessation and restoration by 20th May 2020), 4 (removal of plant and machinery by 20th May 2020) and 39 (removal of Wash Lane crossing and reinstatement of hedgerow by 20th May 2020) attached to planning permission ref ESS/38/18/MAL, to allow additional time for completion and restoration of the development by 20th September 2021
Cobbs Farm Maldon Road Goldhanger Essex CM9 8BQ
Continuation of the construction of an agricultural reservoir by the extraction and removal from the site of sand, gravel and surplus soils, without compliance with Conditions 3 (cessation and restoration by 20th May 2020), 4 (removal of plant and machinery by 20th May 2020) and 39 (removal of Wash Lane crossing and reinstatement of hedgerow by 20th May 2020) attached to planning permission ref ESS/39/18/MAL, to allow additional time for completion and restoration of the development by 20th September 2021