Highfields Bassetts Lane Woodham Walter Chelmsford Essex CM3 4BZ
Prior notification for the change of use of an agricultural building to one dwellinghouse (Use Class C3) and for associated operational development
Highfields Bassetts Lane Woodham Walter Chelmsford Essex CM3 4BZ
Prior notification for the change of use of an agricultural building to 1No. dwellinghouse (Use Class C3) and for associated operational development
Land South West Of The Warren Hackmans Lane Purleigh Essex
EIA Screening Opinion request is in respect of a full planning application for a ground-mounted solar farm to achieve a generating capacity of approximately up to 25 MWp together with all associated works, equipment, necessary infrastructure and landscape planting (Proposed Development).
Cobbs Farm Maldon Road Goldhanger Essex CM9 8BQ
Continuation of use of a washing plant for processing of indigenous sand and gravel obtained from the construction of an agricultural reservoir without compliance with Conditions 3 (cessation and restoration by 20th May 2020) and 4 (removal of plant and machinery by 20th May 2020 attached to planning permission ref ESS/03/19/MAL, to allow additional time for completion and restoration of the development by 30th September 2021
Cobbs Farm Maldon Road Goldhanger Essex CM9 8BQ
Continuation of the construction of an agricultural reservoir by the extraction and removal from the site of sand, gravel and surplus soils, without compliance with Conditions 3 (cessation and restoration by 20th May 2020), 4 (removal of plant and machinery by 20th May 2020) and 39 (removal of Wash Lane crossing and reinstatement of hedgerow by 20th May 2020) attached to planning permission ref ESS/38/18/MAL, to allow additional time for completion and restoration of the development by 20th September 2021
Cobbs Farm Maldon Road Goldhanger Essex CM9 8BQ
Continuation of the construction of an agricultural reservoir by the extraction and removal from the site of sand, gravel and surplus soils, without compliance with Conditions 3 (cessation and restoration by 20th May 2020), 4 (removal of plant and machinery by 20th May 2020) and 39 (removal of Wash Lane crossing and reinstatement of hedgerow by 20th May 2020) attached to planning permission ref ESS/39/18/MAL, to allow additional time for completion and restoration of the development by 20th September 2021