Land At And Adjacent To The Former Sewage Treatment Works Fairbridge Way Burgess Hill West Sussex RH15 8BF
Application for approval of Reserved Matters pursuant to the Outline Planning Permission reference DM/19/1895 for the approval of the access, appearance, landscaping, layout and scale comprising 307 (Use Class C3) residential units, car and cycle parking, internal roads, a LEMP (400 sq.m) and associated boundary treatments. (Amended Information received 20th January 2022 showing layout amendments to the scheme)
Kingsland Laines Reeds Lane Sayers Common Hassocks West Sussex BN6 9JG
Reserved matters application (pursuant to outline planning permission 12/01540/OUT) relating to matters of appearance, landscape, layout and scale for the construction of a 70-bedroom care home and associated car parking, waste and recycling store, cycle store, foul and surface water drainage, landscaping and tree works, boundary treatments, garden structures, greenhouse and garden shed. Amended plans received 15th November showing revised design to proposed building, landscaping and drainage proposals
Land West Of Burgess Hill Between The A273 And A2300 Burgess Hill West Sussex
Reserved Matters application for DM/18/5114 - the first phase of the Western Link Road, comprising the construction of a new all-movements roundabout on the A273 Jane Murray Way, a single-carriageway 7.3-metre wide highway link with two 3-metre shared footways/cycleways and two 2.75-metre verges, connecting to the A2300 via a new all-movements roundabout, junction to the UKPN electricity substation, junction to future employment uses, zones for two minor junctions, signalised crossing points, earthworks, surface water and foul drainage infrastructure, utilities corridors, lighting, and landscaping. Amended plans and updated supported documents received 17th March 2020 detailing amendments including the extension of the southern boundary of the site to accommodate increased drainage basins and inclusion of bridleway on north side of A2300. (Transport note received 30th April, Amended plans received 12th May showing minor increase in width of application site area either side of the proposed link road corridor and amended biodiversity report, planning statement and additional sections received 29th May)