Garden Lodge Broxmead Lane Bolney Haywards Heath West Sussex RH17 5RF
Retrospective conversion of an agricultural building together with ground and first floor extensions to provide a 2 bedroom, 2 storey dwelling
Willowbrook Danworth Lane Hurstpierpoint Hassocks West Sussex BN6 9LW
Proposed conversion of hay barn to create 1 no. one bedroom single storey dwelling (with two proposed parking spaces) (Planning and Design and Access Statement added 7 June 2023) (Corrected plans received 13 June 2023)
Land South Of Medvale Farm East Street Turners Hill West Sussex
Conversion of rural barn to one 3-bed dwellinghouse
61 - 63 London Road East Grinstead West Sussex RH19 1EQ
Two storey extension above existing building and conversion of first floor to contain 10 flats.
Yew Tree Barn Turners Hill Road Turners Hill Crawley West Sussex RH10 4PE
Conversion and extension of existing workshop to form a 1 bed Annex
Crawley Down Village Hall Turners Hill Road Crawley Down Crawley West Sussex RH10 4HE
Conversion and extension of the existing village hall into 6 no. new residential dwellings with associated landscaping, bin and bike stores.
1-3 King Street East Grinstead West Sussex RH19 3DL
Extension and conversion at 1-3 King Street, East Grinstead to provide one residential unit, with cycle and refuse storage. Amended plans received 26.09.2022 showing alterations to design and form of extension.
Crawley Down Village Hall Turners Hill Road Crawley Down Crawley West Sussex RH10 4HE
(Amended plans received 01/06/2022) Conversion and extension of the existing village hall into 6 no. new residential dwellings with associated landscaping and bin and bike stores.
Horsmanshoad Pickwell Lane Ansty Haywards Heath West Sussex RH17 5RH
Conversion of two existing buildings to two dwelling houses comprising one 1-bed and one 2-bed.
Bolney Park Farm Broxmead Lane Bolney Haywards Heath West Sussex RH17 5RJ
Conversion of barn with associated works to create a two bedroom dwelling along with alterations to adjacent stable buildings. (Location Plan and Sustainability Statement received 09.03.2022. Corrected plans received 09.03.2022 and 22.03.2022)