Teesside Park Phase 3 Newmarket Avenue Thornaby
Scoping request for outline planning permission with all matters reserved except for access comprising the demolition of existing buildings and construction of employment floorspace (Use Classes E(g)(iii)(Light Industrial Processes), B2 (General Industrial) and B8 (Storage and Distribution) and ancillary office floorspace with associated infrastructure, drainage, landscaping and other works (21/2124/SOR)
Grey Towers Nunthorpe Middlesbrough TS7 0PW
Discharge of conditions 3 (Sample of materials), 4 (Construction Compound), 5 (Details of Roads, Footpaths and Open Spaces Required), 8 (Public Rights of Way and Bridleways), 9 (Surface Water Drainage), 10 (Foul and Surface Water (NWL), 12 (Landscape Scheme), 13 (Landscape Management Plan), 14 (Tree Protection and Works) on application 19/0262/VAR
Land At Redcar Bulk Terminal Redcar TS10 5QW
Construction of the Redcar Energy Centre consisting of a material recovery facility incorporating a bulk storage facility, an energy recovery facility and an incinerator bottom ash recycling facility along with ancillary infrastructure and landscaping (R/2020/0411/FFM)
Grey Towers Nunthorpe Middlesbrough TS7 0PW
Discharge of Condition 3 (Sample of materials), 4 (Construction Compound), 5 (Details of Roads, Footpaths and Open Spaces Required), 9 (Surface Water Drainage), 10 (Foul and Surface Water (NWL)), 12 (Landscape Scheme), 14 (Tree Protection and Works) on Application 18/0060/FUL
Albert Park Park Road South Middlesbrough TS5 6LB
Construction of lower lake flood defences including new walls, gates, railings, alterations to footpaths, landscaping and associated construction works