Westwood Park Main Street Thorney NG23 7DA
Construction of Agricultural Building (Part retrospective)
Land At Winkburn Lane Winkburn
Request for confirmation of discharge of conditions 02 (Photographic record), 03 (Surface water discharge scheme) and 04 (Flood warning and action plan) attached to planning permission 22/01782/FULM; Construction of underground electricity cables, substation and associated infrastructure to connect Winkburn Solar Farm to the grid, with access from Caunton Road
Field Reference Number 2227 Hockerton Road Caunton
Construction of a solar farm, access and all associated works, equipment and necessary infrastructure.
Land At Knapthorpe Lodge Hockerton Road Caunton
Construction of a solar farm, access and all associated works, equipment and necessary infrastructure.
Hunters Hill Farm Lambley Road Lowdham NG14 7DF
Request for confirmation of discharge of conditions 8 (Construction Management), 14 (Archaeology), 17 (ecology mitigation) and 18 (CEMP) attached to planning permission 22/02188/FULM; Construction of on-line flood storage reservoir to create upstream storage area on Cocker Beck to provide flood protection to village of Lowdham including removal of material and re-profiling of land and construction of associated embankment that will contain flow control structure in the form of engineered conduit; diversion of Cocker Beck for approximately 670m and diversion of the tributary to the north for approximately 250m; a number of additional elements including; the realignment of two Public Rights of Way, formation of new vehicular access to Lambley Road, residential/farm access track realignment, environmental mitigation works and landscaping (Re-submission of 21/02418/FULM).
Hunters Hill Farm Lambley Road Lowdham NG14 7DF
Request for confirmation of discharge of conditions 3 (Materials), 4 (Arboricultural Method Statement), 8 (Traffic Management), 15 (Levels), 17 (Ecology Mitigation) and 18 (CEMP) attached to planning permission 22/02188/FULM; Construction of on-line flood storage reservoir to create upstream storage area on Cocker Beck to provide flood protection to village of Lowdham including removal of material and re-profiling of land and construction of associated embankment that will contain flow control structure in the form of engineered conduit; diversion of Cocker Beck for approximately 670m and diversion of the tributary to the north for approximately 250m; a number of additional elements including; the realignment of two Public Rights of Way, formation of new vehicular access to Lambley Road, residential/farm access track realignment, environmental mitigation works and landscaping (Re-submission of 21/02418/FULM).
Field Ref No 0878 Caunton Road Norwell
Request of confirmation of discharge of condition 2 attached to planning permission 23/01074/FUL - Construction of a general purpose farm barn and improved access arrangements (Re-submission).
Field Ref No 0878 Caunton Road Norwell
Construction of a general purpose farm barn and improved access arrangements (Re-submission).
Land At Crifton Lodge Farm Forest Lane Bilsthorpe Nottinghamshire
Request for confirmation of discharge of condition 09 (Construction Management Plan) attached to planning permission 19/01299/FULM; Solar farm and associated development including substation compound and buildings, inverter cabins, battery compound and containers, storage buildings, switchgear buildings and communications buildings.
Hunters Hill Farm Lambley Road Lowdham NG14 7DF
Construction of on-line flood storage reservoir to create upstream storage area on Cocker Beck to provide flood protection to village of Lowdham including removal of material and re-profiling of land and construction of associated embankment that will contain flow control structure in the form of engineered conduit; diversion of Cocker Beck for approximately 670m and diversion of the tributary to the north for approximately 250m; a number of additional elements including; the realignment of two Public Rights of Way, formation of new vehicular access to Lambley Road, residential/farm access track realignment, environmental mitigation works and landscaping (Re-submission of 21/02418/FULM).