46 Mansfield Road Blidworth NG21 0RA
Householder prior approval for proposed single storey rear extension The length that the extension extends beyond the rear wall of the original house: 3.36 metres Eaves height of the extension: 3 metres Maximum height of the extension: 3 metres
Telecommunications Cabinet PCP 3 Main Street Bleasby
Installation of Subtended Headend Sidepod onto existing BT cabinet
Telecommunications Mast NOT0210 Ollerton Road Edwinstowe
Proposed Installation of SWANN Crowsnest Headframe Proposed Relocation of 3 existing Antennas 14.0m AGL Proposed Installation of 3 new Antennas 14.0m AGL Proposed Relocation of existing 0.3m Dish and associated Ancillary Upgrades
Telecommunications Mast NOT0027 New Lane Blidworth
Replacement of 3 antennas at 14m height on proposed 3 x 3m long support poles Replacement of 6 mast head amplifiers (MHAs) on proposed support poles Installation of 6 combiners on support poles Installation of GPS node at 3m height fixed to cabin wall at ground level Installation of ancillary equipment and all associated development
Telecommunications Mast NOT0150 Coultas Cover Farm Kirklington Road Eakring
Proposed upgrade of existing 42m high Balfour Beatty Lattice Tower. The existing 3 x Antennas to be removed and replaced with proposed 3 x Antennas on proposed face frame. It is proposed to install 1 x 300mm diameter Dish, 1 x GPS Module and associated ancillary works. Existing Equipment Cabin to be upgraded internally.
Electronic Communications Light Pole Middleton Road Newark On Trent NG24 2DN
New 10m light carrier pole
148 High Street Collingham Newark On Trent NG23 7NH
Application to vary condition 2 attached to planning permission 20/01945/S19LBC to amend the approved plans and discharge conditions 3 (Materials), 15 (Historic Building Recording) & 16 (Methodology of Repair)
Great North Road Solar Park
Development Consent for the Great North Road Solar Park - Scoping Consultation To view the documents, please follow the link: https://infrastructure.planninginspectorate.gov.uk/projects/east-midlands/great-north-road-solar-park/
One Earth Solar Project
Development Consent for the One Earth Solar Project - Scoping Consultation To view the documents, please follow the link; https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/EN010159/EN010159-000005-One%20Earth%20-%20Scoping%20Report.pdf
Electricity Powerline Cross Lane Collingham
Replace overhead conductor on a low voltage power line. Replace the open wired conductor with Aerial Bunding Conductor. The power line will continue to operate at te same voltage. Replacement poles as necessary