The Britannia 2 Plaistow Grove Stratford London E15 3ER
Section 73 application to vary condition 2 (development in accordance with approved plans) to include: amendments to the location of the entrance; the refuse store; and various other alterations attached to planning permission 20/02798/FUL dated 19th February 2021 which granted planning permission for; Proposed conversion and extension to first floor, construction of new second and third floors to create 1x 1bed 2 person flat, 1x 1bed 1 person flat and 4x 2bed 3 person flats, above existing retained Public House.
Good Hotel Western Gateway Canning Town London E16 1FA
Mooring of a 160 room hotel on a floating platform with associated access, car parking and landscaping. (The application is a Departure from the Development Plan) (This application site affects the setting of Grade II Listed Building - Stothert and Pitt Cranes) (The application affects a Public Right of Way) This is a re-consultation in light of following amendments to the scheme; - Increase in number of hotel rooms from 148 to 160 including alterations to the layout and number of wheelchair accessible rooms; - Submission of Framework Water Activation Strategy including new boat moorings; - Submission of Energy and Sustainability Statement Addendum; - Public realm improvements; - Submission of Ecological Assessment - Provision of supporting information and justification
6 Sibley Grove Manor Park London E12 6SE
Lawful Development Certificate for the (proposed) erection of a side dormer extension and window alteration on existing main roof rear dormer (with Juliet balcony)
Bawa Chownk 281 Green Street Forest Gate London Newham E7 8LJ
Section 73 application to vary Condition 2 (Development in accordance with Approved Plans) - Proposed enlargement of the roof extension, alterations to fenestration, removal of refuse and commercial refuse entrances and internal alterations to the units, attached to planning permission 20/01066/FUL dated 10th August 2020 which granted full planning permission for: "Retention of a part two, part three storey extension and basement, alterations to existing 3 bed flat to create 1 x 2 bed flat, change of use of the existing retail space (Use Class A1) on the first floor to 1 x 2 bed flat, proposed extension at second floor level to accommodate 1 x 1 bed flat. Provision of cycle store and refuse store to the rear of the ground floor and a separate refuse store at ground floor. Proposed alterations to all elevations. Retention and proposed internal alterations to retail units (Use Class A1) within basement and ground floor."
115 Flanders Road East Ham London E6 6BL
Application for a lawful development certificate for the proposed alteration of hip roof to a gable-ended roof and the proposed loft conversion with rear dormer with 2 front rooflights.
19 Wall End Road East Ham London Newham E6 2NP
Application for a lawful development certificate for the proposed alteration of hip roof to a gable-ended roof and the proposed loft conversion with rear dormers with 3 front rooflights.
48 Dames Road Forest Gate London Newham E7 0DR
Application for a lawful development certificate for a rear dormer roof extension including 3 rooflights to the front roofslope and minor alterations to the ground floor layout.
Callan Court 54 Warton Road Stratford London E15 2JS
Application for a Lawful Development Certificate for the existing external alterations to part of the rear ground floor and part of the rear first floor.
60 Devenay Road Stratford London Newham E15 4AZ
Application for a lawful development certificate (proposed) for the demolition of a rear conservatory, changes to fenestration on the rear elevation and internal alterations.
Development Site At Hathaway Crescent Manor Park London E12 6LU
Demolition of existing buildings and erection of 3 no. buildings of 7, 6 and 6 storeys (maximum height of 28m) across three development parcels to provide 72 residential units (Use Class C3), comprising a tenure of: sixteen no. 1-bed units, twenty eight no. 2-bed units and twenty eight no. 3-bed units with associated access and infrastructure works, refuse and recycling storage, cycle parking, disabled car parking, hard and soft landscaping and all ancillary works, together with estate-wide public realm interventions including hard and soft landscaping, highways alterations, new and replacement car parking, cycle parking, refuse and recycling storage, play equipment, and all ancillary works and associated development.