Newham Council Planning Applications

Found 3 planning applications

22/02342/VAR | Variation of Condition

250 Green Street Forest Gate London Newham E7 8LF

Section 73 application to vary Condition 2 (Development in accordance with Approved Plans) to alter side fenestration, creation of ancillary office, alterations to rear extension, movement of front roof lights, alterations to rear dormer, introduction of guttering and access doors to the rear and side elevations, attached to planning permission 20/00922/VAR dated 2nd July 2020, which granted full planning permission for: "Section 73 application to vary Condition 2 (approved plans and documents) attached to planning permission 19/02416/FUL dated 29th October 2019 which granted full planning permission for: "Demolition of existing part of building to be rebuilt with side windows, construction of a ground floor rear extension and proposed loft conversion with rear dormer including two velux windows on the front elevation to the first floor flat" [AMENDED PLANS AND DESCRIPTION].

Local Authority
Newham Council
Type
Removal/variation of conditions (Variation of Condition)
Decision
Refused (Refuse)
Application Validated
01/02/2023
Extension Alteration Demolition Construction Roof Conversion Development Windows Office Dormer
23/01800/CLP | Certificate of Lawfulness Proposed Use

50 Colegrave Road Stratford London E15 1ED

Application for a lawful development certificate for proposed construction of rear and side dormer extensions, including 3no. front rooflights, Juliet balcony and an upper side window.

Local Authority
Newham Council
Type
Lawful Development Certificate (LDC) (Certificate of Lawfulness Proposed Use)
Decision
Refused (Refuse)
Application Validated
15/08/2023
Extension Construction Development Windows Dormer Lawful-Development
20/01140/CLP | Certificate of Lawfulness Proposed Use

38 Sandford Road East Ham London E6 3QJ

Application for a lawful development certificate for the proposed construction of a rear dormer extension including skylights to the front elevation. Demolition: Clear and prep loft space, remove old roof tiles and any redundant water storage tank. Construction: Install floor joists and position steel beams to support new floor. Lay insulation. Construct new frame of the dormer extensions. Install internal walls along with openings for windows and doors specified. Fit staircase accordingly. Roofing: Lay weatherproof roof where necessary. Re-tile roof and apply new tiles to dormer walls. Electrics: Install sockets, lights, smoke detectors, bathroom extractor and wiring Plastering: Install plasterboard to walls and skim with plaster. Plumbing: Position and install toilet, sink, shower, radiators and pumps etc. Connect existing water and central heating system accordingly. Decorating: Install architraves, skirting, fire doors, final electrics (tested).

Local Authority
Newham Council
Type
Lawful Development Certificate (LDC) (Certificate of Lawfulness Proposed Use)
Decision
Approved (Approve)
Application Validated
05/06/2020
Extension Construction Roof Development Windows Dormer Lawful-Development