4 Manbey Park Road Stratford London E15 1EY
Approval of details pursuant to conditions 3 (Demolition and Construction Management Plan), 4 (Contamination), 5 (Transportation Noise), 6 (Materials requiring subsequent approval), 7 (Cycle Parking Facilities), 8 (Refuse Storage & Recycling) and 10 (Hard & Soft Landscaping) attached to planning permission 21/02235/FUL dated 14th December 2021. APPROVAL OF CONDITION 4 (PART A AND B), 5 (PART A AND B) AND 8 ONLY.
274-276 Neville Road Forest Gate London E7 9QN
Approval of details pursuant to Condition 3 (Control of Dust and Emissions from Construction and Demolition) 4 (Construction Management and Logistics Plan) 5 (Surface Water Drainage Detail) and (Air Quality Neutral) attached to planning permission 19/02596/FUL, Allowed on Appeal APP/G5750/W/20/3253777 dated 2nd June 2021 - APPROVAL OF CONDITION 6 ONLY
250 Green Street Forest Gate London Newham E7 8LF
Section 73 application to vary Condition 2 (Development in accordance with Approved Plans) to alter side fenestration, creation of ancillary office, alterations to rear extension, movement of front roof lights, alterations to rear dormer, introduction of guttering and access doors to the rear and side elevations, attached to planning permission 20/00922/VAR dated 2nd July 2020, which granted full planning permission for: "Section 73 application to vary Condition 2 (approved plans and documents) attached to planning permission 19/02416/FUL dated 29th October 2019 which granted full planning permission for: "Demolition of existing part of building to be rebuilt with side windows, construction of a ground floor rear extension and proposed loft conversion with rear dormer including two velux windows on the front elevation to the first floor flat" [AMENDED PLANS AND DESCRIPTION].
The Gate House 230B Grange Road Plaistow London E13 0HG
Approval of details pursuant to Condition 3 (Environmental Code) and Condition 6 (Demolition and Construction Management Plan) attached to Planning Consent 22/00403/FUL dated 16th June 2022.
169 Haldane Road East Ham London Newham E6 3JW
Demolition of existing 2 storey building (adjacent to dwelling at 169) and sheds to the rear. Construction of a 2 storey dwelling house to the rear and 2 storey infill building adjacent to 169 (for use as ancillary space for new rear dwellinghouse), with associated refuse storage, cycle storage, boundary treatment, and landscaping.
340 - 344 Green Street Upton Park London E13 9AP
Approval of details pursuant to Condition 3 (Demolition and Construction Management Plan) attached to Planning Consent 20/01999/FUL dated 25th November 2020.
120 Holland Road East Ham London E6 2EP
Demolition of existing garage, construction of a double storey side extension including a rear dormer and rear double storey extension.
109A Earlham Grove Forest Gate London E7 9AN
Section 73 application to vary Condition 2 (Approved plans and documents) - The front and rear gardens are proposed to be replaced with permeable resin bound surfaces attached to Planning Permission 19/02499/FUL dated 21/11/2019, which granted planning permission for; Demolition of existing garage at front elevation and construction of a three storey building to comprise of 4no. Flats.
Land To The Rear Of 330 Romford Road Forest Gate London E7 8BS
Approval of details pursuant to Condition 3 (Demolition and Construction Management Plan) attached to planning permission 19/02679/FUL dated 12th October 2021.
Methodist Church Woodgrange Road Forest Gate London E7 0QH
Approval of details pursuant to Condition 6 (Control of Dust and Emissions from Construction and Demolition (Detailed)), Condition 7 (Environmental Code - Detailed) and Condition 8 (Demolition and Construction Management and Logistics Plan) attached to Planning Consent 18/02396/FUL dated 17th July 2020.