Macaulay Lane Former Refuse Disposal Site Macaulay Street Grimsby North East Lincolnshire
Construction and operation of 8MW (export) solar panel development, erection of palisade fencing, substation, cabins, CCTV units, a satellite mast, service roads and associated works
North East Lincolnshire Area Waithe Lane Brigsley North East Lincolnshire
Retrospective application for the installation of post construction field drainage to support the operation of the Hornsea Project Two Offshore Wind Farm onshore export cable route (falls within the Brigsley, Barnoldby-le-Beck, Bradley, Laceby, Stallingborough, Immingham and Habrough Parishes) The area outlined in the submitted plans and supporting documentation covers the installed drainage pipes and outfalls that have been installed outside the Development Consent Order Limits in order to provide an optimal drainage solution for each parcel of land
Former Birds Eye Site Ladysmith Road Grimsby North East Lincolnshire
Reserved matters pursuant to DM/0675/15/LDO for a mixed use development comprising 184 houses, 76 apartments and 1000m2 of commercial floor space with appearance, access, layout, scale and landscaping to be considered. Along with details to discharge Condition 7 (Construction Management Plan), Condition 8 (Access Details) and Condition 12 (Foul and Surface Water Drainage) - original amendments include layout and boundary changes and reconfiguration of properties facing Ladysmith Road. Further amendments include changing some 2 bed units to 3 beds with inclusion of dormers within roof (to plots 57, 62, 68, 69, 73, 74, 79, 81, 85, 86, 87, 89, 92, 95, 96, 101, 106, 107, 110, 111, 117, 118, 121 of phase 2 and 128, 130, 133, 134, 138, 142, 143, 148, 149, 152, 154, 158, 159, 162, 163, 164, 169, 173 of phase 3 and 176, 177, 178 and 183 of phase 4) with amendments (May 2019) including rear projections of 900mm to plot 42 in phase 1 and to all plots within phase 2 onwards (except blocks A and B) and (Oct 2021) including increase in dwelling sizes of plots 84-123 (phase 2), 124-174 (phase 3) and 175-184 (phase 4) and (Jan 2022) a reconfiguration in the layout, design and position of Apartment Block B (phase 4)
Land Off Waltham Road Brigsley North East Lincolnshire
Retrospective application for the installation of post construction drainage pipes and an outfall in order to enable the ongoing function of the existing drainage system and aid in addressing any potential flood risk as a result of the Hornsea Project Two works. The area outlined in the submitted plan and supporting documents cover the installed drainage pipes and outfall that has been installed outside the Development Consent Order Limits
Land At Hewitts Avenue New Waltham North East Lincolnshire
Details in discharge of conditions 3 (Archaeology), 4 (Construction Method Statement), 5 (Highway Details) and 9 (Travel Plan) pursuant to DM/0971/17/FUL (Full planning permission for the development of 68 houses and 18 apartments with new access and associated landscaping and works in accordance with amended plans received 17th August 2018 showing drainage details (including pump station location and layout) and landscape details).
North East Lincolnshire Area Keelby Road Stallingborough North East Lincolnshire
Installation of field drainage to support the construction of the Hornsea Project One Offshore Wind Farm onshore export cable route including proposed drainage pipes and outfalls (falls within Stallingborough, Laceby, Immingham, Habrough, Healing and Bradley Parishes) The application covers the installation of pre-construction field drainage to support the construction of the Hornsea Project Two Offshore Wind Farm onshore export cable route. The area outlined in the submitted plans and supporting documentation covers the installed drainage pipes and outfalls that have been installed outside the Development Consent Order Limits in order to provide an optimal drainage solution for each parcel of land.
Communications Mast At Shell Moody Lane Grimsby North East Lincolnshire DN31 2SY
Details in discharge of Condition 3 (Construction Traffic) pursuant to DM/1141/19/FUL (Replace existing 12.5m monopole with a 20.0m high monopole supporting 12 no antenna apertures, together with the installation of ground-based equipment cabinets and ancillary development thereto)
Land At Genesis Way Europarc Healing North East Lincolnshire DN37 9TU
Details in discharge of Condition 4 (Highway Details), 5 (Construction Management Plan), 6 (Flood Risk), 8 (Surface Water Drainage), 10 (Improving Air Quality) pursuant to DM/0120/19/REM (Reserved matters application following DC/323/12/WOL (Development of remaining plots on Europarc- B1 (office, research & development, light industry), B2 (general industry), B8 (storage & distribution), C1 (hotel), A1(shops), A2 (financial & professional services), A3 (restaurants & cafes), A4 (drinking establishments), D1 (non-residential institutions (Creche), D2 (assembly & leisure (Gymnasium) uses) to erect 2 industrial units and associated works with appearance, scale, layout, access, and landscaping to be considered)
Diana Princess Of Wales Hospital Off Forsythia Drive Scartho Grimsby North East Lincolnshire
Details in discharge of Conditions 4 (Foul and Surface Water Drainage), 8 (Road Construction Details), 9 (Construction Management Plan), 12 (Contamination), 13 (Remediation), 14 (Remediation/Verification Report), 15 (Contamination), 16 (Foundation Details) and 18 (Junction Improvement works) pursuant to DM/0937/15/OUT (Outline application for residential development for up to 131 dwellings with Step Down Care Unit (approximately 40 bedrooms), Assisted Living Unit (approximately 80 bedrooms), Retirement Living Unit (approximately 59 apartments), NHS Trust Accommodation (approximately 125 apartments & 96 student bedrooms) and club house, with means of access to be considered) for zones 3A and 3B (other than condition 18 which is for zones 3A, 3B, 5, 6 and 6A) and for condition 14 which only relates to phases 1-4 (inclusive) and phase 12 of 3A and 3B (as shown on Phasing Plan 2427-HA-A20-XX-DR-A-SITE801 P02 Rev B)
Plot 1 Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Details in discharge of Condition 3 (Construction Management and Construction Traffic Plan), Condition 5 (Surface Water Drainage), Condition 6 (Foul Water Drainage) and Condition 9 (Piling Details) pursuant to DM/0858/19/REM (Reserved matters application following DM/0105/18/FUL (Hybrid application seeking outline consent with access, landscaping and scale to be considered for the development of a 62ha Business Park comprising up to 120,176 sq.m for B1 (Business), B2 (General Industrial) and B8 (Storage and Distribution), associated infrastructure and internal highways. Full application for the creation of a new roundabout, new access roads, associated highway works, substations, pumping stations, drainage and landscaping. (Amended FRA and Drainage Strategy July 2018)) to erect a detached business unit of mixed use (B1/ B8) to include access road, car park with HGV loading, landscaping and associated works.)