Land Opp Power Station (Plot E) Humber Gate Energy Park Way Grimsby North East Lincolnshire
Details in discharge of Condition 6 (Construction Management Plan) and 7 (Piling) pursuant to DM/0625/19/FUL (Erection of industrial manufacturing building, installation of attenuation tank, erection of 2.4m high palisade fence/gates and make existing access redundant and create new access)
Land Opp Power Station (Plot E) Humber Gate Energy Park Way Grimsby North East Lincolnshire
Details in discharge of Condition 3 (Materials) pursuant to DM/0625/19/FUL (Erection of industrial manufacturing building, installation of attenuation tank, erection of 2.4m high palisade fence/gates and make existing access redundant and create new access)
Immingham Resource Centre Margaret Street Immingham North East Lincolnshire DN40 1LE
Details in Discharge of Conditions 3 (Highways Construction Details), 4 (Management Details), 5 (Construction Traffic Management Plan), 6 (Residential Travel Plan), 7 (Foul Drainage), 9 (Levels), 11 (Construction Management Plan), 12 (Electric Vehicle Charging Points), 13 (Water Efficiency), 14 (Scheme of Landscaping), 15 (Landscaping), 17 (Contamination), 18 (Remediation), 22, (Materials) and 23 (Demolition) pursuant to DM/0269/17/FUL (Erection of 60 dwellings with garages and/or parking spaces together with associated roads, sewers, infrastructure and landscaping) - ANGLIAN WATER DETAILS
Manor House Tetney Road Humberston Grimsby North East Lincolnshire DN36 4JE
Details in Discharge of Conditions 2 (Drainage), 3 (Highways), 4 (CMP), 5 (Archaeology), 7 (Landscaping), 8 (Materials), 9-13 (Contamination), 14 (Management Arrangements), 15 (Windows and Doors), 17 (Ecology), 18 (Historic Record), 19 (Rainwater Goods and External Ventilation) and 22 (Repair Schedule) of Phases 2 and 3 pursuant to DM/0199/16/FUL - Proposed conversion of existing barns into 5 dwellings and erection of 4 new dwellings, including demolition of the modern farm building, parking & landscaping
Manor House Tetney Road Humberston Grimsby North East Lincolnshire DN36 4JE
Details in discharge of Conditions 2 (Materials), 3 (Windows and Doors), 4 (Sample Panel), 5 (Historic Record), 6 (Rainwater Goods and External Ventilation), 7 (Method Statement) for Phases 2 and 3 pursuant to DM/0200/16/LBC (Proposed conversion of existing barns into 5 dwellings and erection of 4 new dwellings, including demolition of the modern farm building, parking & landscaping)
Land Off Healing Road Stallingborough North East Lincolnshire
Details in discharge of conditions 2 (Vehicular Access and Parking), 3 (Construction Traffic Management Plan), 4 (Construction Management Plan), 5 (Materials), 6 (Drainage), 7 (Landscaping) and 8 (Retention of Landscaping) pursuant to DM/0378/18/REM (Reserved matters application pursuant to DM/0886/16/OUT for the erection of 3 dwellings with garages and associated works)
Wentworth House 4 Church Lane Stallingborough North East Lincolnshire DN41 8AA
Details in discharge of conditions 3 (Materials), 4 (Construction Management Plan), 5 (Bats), 6 (Ecology and Biodiversity Improvements), 7 (Archaeology), 8 (Drainage), 9 (Landscaping), 11 (Highways Maintenance), 12 (Highways Details) and 13 (Demolition Method Statement) pursuant to DM/0001/17/FUL (Demolish existing outbuildings, erect 7 dwellings to include the installation of rooflights, garaging, landscaping, access road and turning area, bin store and the erection of garage to serve existing dwelling (Wentworth House))
Crematorium Weelsby Avenue Grimsby North East Lincolnshire DN32 0BB
Details in Discharge of Condition 4 (External Materials) pursuant to DM/0800/19/FUL (Erection of farewell chapel covering existing courtyard and erection of pet crematorium unit housed within a container to include flue)
Land Off Cheapside Waltham North East Lincolnshire
Details in discharge of conditions pursuant to DM/0335/19/FUL (Variation application of condition 15 (Approved Plans) as granted on DM/1130/14/FUL (Hybrid application for the erection of 53 dwellings (C3), landscaping, access and associated on-site infrastructure (Full). Also the erection of 42 dwellings (C3) with associated landscaping and access (Outline) all to include amended plan showing proposed new roundabout on Cheapside received by the Local Planning Authority on 7th January 2015) to omit roundabout, add traffic calming gates and adjust main access, resite various plots and revised landscaping, drainage and infrastructure)
Ash Holt Waithe Lane Brigsley Grimsby North East Lincolnshire DN37 0RJ
Details in discharge of Conditions 5 (Landscaping), 6 (Surface Water Drainage), 8 (Construction Management Plan) and 9 (Highways) pursuant to DM/1041/19/FUL (Erect private equine facility including the erection of single storey stable building, a covered horse walker, construct a horse arena, parking area, create a new access and change of use of land for equine purposes and associated works)