Land To The North Of White Cross Lane Burton Gorse Sleaford
Application to vary conditions 6 (construction phase ecological mitigation strategy), 7 (landscape and ecological management plan), 8 (tree/ hedgerow protection scheme) and 11 - (approved plans) of planning permission 19/0863/FUL - Proposed solar farm (32MW) and associated development including substation, inverter cabins, switchgear/communications buildings and access track. To reflect differences between approved plans and drawings, and the as built development
Grange Farm Long Lane Brauncewell Lincoln Lincolnshire LN5 0DH
Application to discharge conditions 2 (materials), 3 (re-pointing method), 4 ( eaves/ verge treatment & rainwater goods), 5 (windows & doors), 6 (arboricultural method statement), 7 (soft landscaping), 9 (contaminated land), 10 (bat/bird boxes) & 11 (bat survey) attached to planning permission 20/1353/FUL - Change of use of redundant agricultural barn to 1no dwelling and for associated operational development
Home Farm 73 High Street South Kyme Lincoln Lincolnshire LN4 4AE
Application for a non material amendment (revised plans) following the grant of planning permission 21/0912/RESM (Reserved matters application for the erection of 10 dwellings, access, appearance, landscaping, layout and scale to be considered following outline permission 19/0787/OUT- Outline application for the re-development of Farm Yard for the erection of up to 10no. dwellings (All matters reserved)).
Home Farm 73 High Street South Kyme Lincoln Lincolnshire LN4 4AE
Reserved matters application for the erection of 10 dwellings, access, appearance, landscaping, layout and scale to be considered following outline permission 19/0787/OUT- Outline application for the re-development of Farm Yard for the erection of up to 10no. dwellings (All matters reserved)
Land To The North Of White Cross Lane, Burton Gorse Sleaford Lincs
Application to discharge conditions 3 (programme of archaeological work), 4 (Construction Management Plan and Method Statement), 5 (Whitecross Lane improvements), 6 (construction phase ecological mitigation strategy) & 7 (landscape and ecological management plan (LEMP) ) attached to application 19/0863/FUL - Proposed solar farm (32MW) and associated development including substation, inverter cabins, switchgear/communications buildings and access track