North Kesteven District Council Planning Applications

Found 5 planning applications

23/0435/DISCON | Discharge of Conditions

Land Off Thorpe Lane South Hykeham Lincoln Lincolnshire

Application to discharge conditions 8 (Construction Method Statement), 14 (Arboricultural Method Statement) and 20 (Anti Dazzle Fence) attached to planning permission 18/0760/OUT - Residential development of up to 144 dwellings and associated works (outline with means of access)

Local Authority
North Kesteven District Council
Type
Approval (Discharge) of conditions (Discharge of Conditions)
Decision
Approved (Approved)
Application Received
05/04/2023
Application Validated
14/04/2023
Construction Development Dwelling Residential Discharge Fence
23/0451/DISCON | Discharge of Conditions

Sleaford Golf Club Willoughby Road Greylees Sleaford Lincolnshire NG34 8PL

Application to discharge conditions 2 (clay pantiles), 5 (rooflights), 6 (boundary treatments - partial discharge-fencing type only), 8 (construction method statement), 10 (ecology - timing of works) 11 (protected species) & 12 (ecology- partial discharge- owl box approved under 21/1231/DISCON) attached to planning permission 20/0725/FUL - Conversion of a barn into a dwelling with associated works and alterations (access from Kelby Road).

Local Authority
North Kesteven District Council
Type
Approval (Discharge) of conditions (Discharge of Conditions)
Decision
Approved (Approved)
Application Received
17/04/2023
Application Validated
27/04/2023
Alteration Construction Conversion Dwelling Discharge Fence Boundary
21/0887/DISCON | Discharge of Conditions

Land South Of Gorse Lane Silk Willoughby Sleaford Lincolnshire

Application to discharge condition 3 (Pre-construction Condition Survey), 4 (Construction Management Plan and Method Statement), 5 (Landscape and Ecological Management Plan and Enhancement Plan), 6 ( Tree and Hedgerow Planting) and 10 (Work Written Specification) attached to application 19/0060/FUL - Erection of Solar PV park (circa 20MW electricity generating capacity) including inverters, substations, office building, store, perimeter fencing, access tracks, temporary construction compound and associated development.

Local Authority
North Kesteven District Council
Type
Approval (Discharge) of conditions (Discharge of Conditions)
Decision
Approved (Approved)
Application Received
09/06/2021
Application Validated
09/06/2021
Erection Construction Development Landscaping Discharge Trees Office Fence
21/1166/DISCON | Discharge of Conditions

Installation Of High Voltage Direct Current (DC) Cables For The Viking Link Interconnector Project Between Proposed Landfall At Boygrift In East Lindsey To A Proposed Converter Station At North Ing Drove In South Holland

Application to discharge condition 14 (Archaeological Mitigation) attached to application 17/1200/FUL - Works to facilitate the Viking Link electrical interconnector with an approximate capacity of 1400 megawatts (MW) extending from Revsing, Jutland, (Denmark) to Bicker Fen, Lincolnshire (UK) comprising: - Installation of two (2) subsea high voltage direct current (DC) cables between Mean Low Water Springs (MLWS) and landfall at Boygrift in East Lindsey; - Installation of two (2) onshore DC cables between the landfall at Boygrift and the converter station at North Ing Drove in South Holland; - Construction of associated Temporary Construction Compounds (TCC) and Temporary Works Areas (TWA) and temporary vehicle access arrangements required for DC and AC cable installation; - Erection of converter station buildings together with the formation of internal roads, permanent access road from the A52, erection of security fencing, formation of landscaping with associated temporary construction compounds; - Installation of up to six (6) onshore high voltage alternating current (AC) cables between the converter station at North Ing Drove and the existing Bicker Fen 400 kilovolt (400kV) Substation owned and operated by National Grid Electricity Transmission Plc (NGET); - Installation of link pillars along the AC cable route for inspection and maintenance purposes, these will be contained within fenced areas; - Installation of two substation bays at Bicker Fen Substation to allow Viking Link to be connected to the National Grid electricity transmission system; - Installation of all associated drainage mitigation works; and - Installation of fibre-optic cable(s) with the high voltage AC and DC cables (A bay consists of switching equipment including circuit breakers, disconnector and measuring equipment. NGET will be providing Viking Link the space available to connect to Bicker Fen).

Local Authority
North Kesteven District Council
Type
Approval (Discharge) of conditions (Discharge of Conditions)
Decision
Approved (Approved)
Application Received
30/07/2021
Application Validated
30/07/2021
Erection Construction Landscaping Discharge Fence
21/0282/DISCON | Discharge of Conditions

Installation Of High Voltage Direct Current (DC) Cables For The Viking Link Interconnector Project Between Proposed Landfall At Boygrift In East Lindsey To A Proposed Converter Station At North Ing Drove In South Holland;

Application to discharge condition 5 (Landscape Restoration) attached to planning permission 17/1200/FUL - Works to facilitate the Viking Link electrical interconnector with an approximate capacity of 1400 megawatts (MW) extending from Revsing, Jutland, (Denmark) to Bicker Fen, Lincolnshire (UK) comprising: - Installation of two (2) subsea high voltage direct current (DC) cables between Mean Low Water Springs (MLWS) and landfall at Boygrift in East Lindsey; - Installation of two (2) onshore DC cables between the landfall at Boygrift and the converter station at North Ing Drove in South Holland; - Construction of associated Temporary Construction Compounds (TCC) and Temporary Works Areas (TWA) and temporary vehicle access arrangements required for DC and AC cable installation; - Erection of converter station buildings together with the formation of internal roads, permanent access road from the A52, erection of security fencing, formation of landscaping with associated temporary construction compounds; - Installation of up to six (6) onshore high voltage alternating current (AC) cables between the converter station at North Ing Drove and the existing Bicker Fen 400 kilovolt (400kV) Substation owned and operated by National Grid Electricity Transmission Plc (NGET); - Installation of link pillars along the AC cable route for inspection and maintenance purposes, these will be contained within fenced areas; - Installation of two substation bays at Bicker Fen Substation to allow Viking Link to be connected to the National Grid electricity transmission system; - Installation of all associated drainage mitigation works; and - Installation of fibre-optic cable(s) with the high voltage AC and DC cables (A bay consists of switching equipment including circuit breakers, disconnector and measuring equipment. NGET will be providing Viking Link the space available to connect to Bicker Fen).

Local Authority
North Kesteven District Council
Type
Approval (Discharge) of conditions (Discharge of Conditions)
Decision
Approved (Approved)
Application Received
26/02/2021
Application Validated
26/02/2021
Erection Construction Landscaping Discharge Fence