Land To The North Of White Cross Lane Burton Gorse Sleaford
Application to vary conditions 6 (construction phase ecological mitigation strategy), 7 (landscape and ecological management plan), 8 (tree/ hedgerow protection scheme) and 11 - (approved plans) of planning permission 19/0863/FUL - Proposed solar farm (32MW) and associated development including substation, inverter cabins, switchgear/communications buildings and access track. To reflect differences between approved plans and drawings, and the as built development
Land North Of Pride Parkway Pride Parkway Sleaford NG34 8GL
Application to discharge Condition 6 (details of tactile paving and dropped kerb/s, 7 (Sleaford Wood connection), 10 (surface water drainage infrastructure) 11 (foul water management strategy), 12 (Construction Ecological Management Plan), 15 & 16 (details of tree protection), 18 (archaeological mitigation), 19 (Construction Method Statement) and 22 (details of the design code) re planning permission 20/1475/FUL (Hybrid planning application for the construction of an employment park comprising of up to 35,851 sq.m (GIA) of general industrial and warehouse and distribution floorspace (Use Class B2 and B8 with ancillary Use Class E(g) plus 1,394 sq.m (GIA) of trade showroom floorspace (Use Class E(a)/(c) incorporating the construction of site-wide infrastructure works comprising access, drainage, earthworks and strategic landscaping (full application) and on-plot development of 37,245 sq.m (GIA) of floor space (outline with all matters reserved)
Land South Of Gorse Lane Silk Willoughby Sleaford Lincolnshire
Application to discharge condition 3 (Pre-construction Condition Survey), 4 (Construction Management Plan and Method Statement), 5 (Landscape and Ecological Management Plan and Enhancement Plan), 6 ( Tree and Hedgerow Planting) and 10 (Work Written Specification) attached to application 19/0060/FUL - Erection of Solar PV park (circa 20MW electricity generating capacity) including inverters, substations, office building, store, perimeter fencing, access tracks, temporary construction compound and associated development.
Land North East Of Scopwick Scopwick LN4 3PH
Certificate of Lawful development for an existing use in respect of the construction of approved access junction to B1188 and first section of road pursuant to 16/0410/VARCON - Application to vary conditions 3 (Scheme of landscaping and biodiversity enhancements), 4 (Scheme of protection for Great Crested Newts), 5 (Scheme of works to ensure that archaeological remains are preserved), 8 (Provision of wheel-washing facilities), 11 (Code of Practice) and 12 (Scheme of protection for trees and hedgerows) attached to planning application 14/0937/FUL - Development of a solar photovoltaic power generating installation with associated 132kv substation, transformer/inverter stations, internal access tracks, security fencing and landscaping - to allow phased commencement of development.