Land South Of Whisby Road, Teal Park North Hykeham (Teal Park Parcel 2.1)
Application to discharge conditions 8 (Code of Practice), 10 (Lighting) and 11 (Supplementary Fencing) attached to 22/0043/RESM - Reserved matters application (with details of access, appearance, landscaping, layout and scale) for the erection of a builders' merchant (sui generis) trade counter, class B8, E(g)iii and ancillary office use for the display, sale (trade/retail), distribution and storage of building materials, along with plant/tool hire and click and collect facility together with access formation and parking (pursuant to application 09/0633/OUT as varied by 18/0309/VARCON)
Dunsby House Lincoln Road Dunsby St Andrews Sleaford Lincolnshire NG34 8RJ
Application to discharge condition 4 (tree/hedgerow protection) and 8 (landscaping) re planning permission 20/0903/HOUS (Tennis court with fence enclosure).
North Hilltop Farmhouse The Heath Leadenham Lincoln Lincolnshire LN5 0QF
Application to discharge conditions 4 (Site Lighting), 5 (Building Repair), 6 (Levelling), 7 (Access), 10 (Planting), 13 (Archaeology) and 14 (Pest Control) attached to planning permission 19/1764/FUL - Creation of an all-weather facility comprising of a polo arena, conversion of farm buildings into stables, new fencing, landscaping, lighting scheme, new car parking area
Land South Of Gorse Lane Silk Willoughby Sleaford Lincolnshire
Application to discharge condition 3 (Pre-construction Condition Survey), 4 (Construction Management Plan and Method Statement), 5 (Landscape and Ecological Management Plan and Enhancement Plan), 6 ( Tree and Hedgerow Planting) and 10 (Work Written Specification) attached to application 19/0060/FUL - Erection of Solar PV park (circa 20MW electricity generating capacity) including inverters, substations, office building, store, perimeter fencing, access tracks, temporary construction compound and associated development.
Sir William Robertson High School Main Road Welbourn Lincoln Lincolnshire LN5 0PA
Application to discharge condition 3 (community use scheme) attached to planning permission 19/1280/FUL - Creation of an Artificial Grass Pitch (AGP) for school and community use with associated fencing, barriers and entrance gates plus associated porous asphalt surfacing for portable goals storage, pedestrian circulation access, vehicular maintenance and emergency access; floodlight system, erection of high maintenance equipment store, together with soft landscaping work involving the creation of grassed mound within playing field and screen planting.
Installation Of High Voltage Direct Current (DC) Cables For The Viking Link Interconnector Project Between Proposed Landfall At Boygrift In East Lindsey To A Proposed Converter Station At North Ing Drove In South Holland
Application to discharge condition 14 (Archaeological Mitigation) attached to application 17/1200/FUL - Works to facilitate the Viking Link electrical interconnector with an approximate capacity of 1400 megawatts (MW) extending from Revsing, Jutland, (Denmark) to Bicker Fen, Lincolnshire (UK) comprising: - Installation of two (2) subsea high voltage direct current (DC) cables between Mean Low Water Springs (MLWS) and landfall at Boygrift in East Lindsey; - Installation of two (2) onshore DC cables between the landfall at Boygrift and the converter station at North Ing Drove in South Holland; - Construction of associated Temporary Construction Compounds (TCC) and Temporary Works Areas (TWA) and temporary vehicle access arrangements required for DC and AC cable installation; - Erection of converter station buildings together with the formation of internal roads, permanent access road from the A52, erection of security fencing, formation of landscaping with associated temporary construction compounds; - Installation of up to six (6) onshore high voltage alternating current (AC) cables between the converter station at North Ing Drove and the existing Bicker Fen 400 kilovolt (400kV) Substation owned and operated by National Grid Electricity Transmission Plc (NGET); - Installation of link pillars along the AC cable route for inspection and maintenance purposes, these will be contained within fenced areas; - Installation of two substation bays at Bicker Fen Substation to allow Viking Link to be connected to the National Grid electricity transmission system; - Installation of all associated drainage mitigation works; and - Installation of fibre-optic cable(s) with the high voltage AC and DC cables (A bay consists of switching equipment including circuit breakers, disconnector and measuring equipment. NGET will be providing Viking Link the space available to connect to Bicker Fen).
Installation Of High Voltage Direct Current (DC) Cables For The Viking Link Interconnector Project Between Proposed Landfall At Boygrift In East Lindsey To A Proposed Converter Station At North Ing Drove In South Holland;
Application to discharge condition 5 (Landscape Restoration) attached to planning permission 17/1200/FUL - Works to facilitate the Viking Link electrical interconnector with an approximate capacity of 1400 megawatts (MW) extending from Revsing, Jutland, (Denmark) to Bicker Fen, Lincolnshire (UK) comprising: - Installation of two (2) subsea high voltage direct current (DC) cables between Mean Low Water Springs (MLWS) and landfall at Boygrift in East Lindsey; - Installation of two (2) onshore DC cables between the landfall at Boygrift and the converter station at North Ing Drove in South Holland; - Construction of associated Temporary Construction Compounds (TCC) and Temporary Works Areas (TWA) and temporary vehicle access arrangements required for DC and AC cable installation; - Erection of converter station buildings together with the formation of internal roads, permanent access road from the A52, erection of security fencing, formation of landscaping with associated temporary construction compounds; - Installation of up to six (6) onshore high voltage alternating current (AC) cables between the converter station at North Ing Drove and the existing Bicker Fen 400 kilovolt (400kV) Substation owned and operated by National Grid Electricity Transmission Plc (NGET); - Installation of link pillars along the AC cable route for inspection and maintenance purposes, these will be contained within fenced areas; - Installation of two substation bays at Bicker Fen Substation to allow Viking Link to be connected to the National Grid electricity transmission system; - Installation of all associated drainage mitigation works; and - Installation of fibre-optic cable(s) with the high voltage AC and DC cables (A bay consists of switching equipment including circuit breakers, disconnector and measuring equipment. NGET will be providing Viking Link the space available to connect to Bicker Fen).