Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal Submission to discharge of Requirement 6(1)(f) (Emergency Response Plan for Flood Events for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as amended)
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal Submission to discharge of Requirement 20 (Removal of temporary bridges and culverts for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016
Locking Parklands Locking Moor Road Weston-super-Mare North Somerset
Discharge of Condition No.7 (Scope of Works), 8 (Site Development Project Plan), 11 (Construction Management Plan), 14 (Treatment and Removal of Suspended Solids), 20 (Landscape and Management Plan), 24 (Ecological Survey), 26 (External Lighting), 27 (Biodiversity and Nature Conservation Management Plan), 28 (Pre-demolition Checks of Protected Species), 32 (Land Contamination Assessment), 33 (Remediation Scheme), 38 (Lifetime Homes), and 40 (Columns and Lantern Plan) from application No. 13/P/0997/OT2
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to discharge Requirement 10 (Scheme of Replacement Planting for Stage 8 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
Land At Blagdon Sewage Treatment Works Garston Lane Blagdon North Somerset
Screening Opinion request to determine as to whether proposed development is EIA development. Works proposed; extension to Blagdon water recycling centre (WRC (formerly referred to as Sewage Treatment Works)) and the laying of a new 3.25km twin sewer pipeline to transfer the stormwater and wastewater currently received and treated at the Ubley WRC to the Blagdon WRC for treatment and discharge. THIS IS NOT A PLANNING APPLICATION
Gatcombe Farm Industrial Estate West Hay Road Wrington North Somerset BS40 5GF
Request to discharge condition 26 (The development is connected to a viable watercourse/ditch network) from application No. 21/P/0019/OUT
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to discharge Requirement 5(2)(b) (Biodiversity Mitigation Strategy Addendum for Stage 9 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
Land At Parklands Churchland Way Weston-super-Mare
Request to discharge part of condition 41 (Permitted Development) from application No. 16/P/2744/OT2
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to discharge Requirement 10 (Replacement Planting for Stage 2.2 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 5(4) (Construction Environmental Management Plan Addendum for Stage 7.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).