Ground Floor Unit 10 Middle Bridge Business Park Bristol Road Portishead BS20 6PN
Construction of 2no. external compounds, with timber slat and post fencing on a concrete base to match the existing compound (1no. generator compound and attached cylinder cage; 1no. waste compound). Alterations to side elevation of building to remove 1no. existing external window and brickwork and replace with new external door