Land SW Of Long Ashton Park And Ride, Off Gurney Roundabout (A370) And Colliters Way Long Ashton
Request for formal screening and scoping opinions as to whether proposed development is Environmental Impact Assessment development and the requirements of an Environmental Statement if required to be submitted with a haybrid planning application for the construction of new office campus on phased basis. Phase one in full comprising including three office buildings, culinary building, training centre and auditorium. Phase two in outline comprising two further office buildings. Use (Class E(g)(i)); New accesses from the public highway, internal site roads and footpaths, public realm works and landscaping. Below ground car and cycle parking, ancillary plant and servicing and other associated works. THIS IS NOT A PLANNING APPLICATION
Gatcombe Farm Industrial Estate West Hay Road Wrington Bristol BS40 5GF
Non material amendment to application 22/P/1256/RM (Reserved matters application for appearance pursuant to outline permission 21/P/0019/OUT (Outline application for redevelopment of Gatcombe Farm Industrial Estate entailing demolition and site clearance; construction of 38 No. dwellings (class C3) and 450sq.m offices (class E) in 2 No. buildings. Associated works including internal road network, car parking, drainage, open space and play area. Full details provided for access, layout, scale and landscaping. Matters of appearance reserved for subsequent approval) for 37no dwellings and 335.1 sq.m of commercial floorspace (Use Class E). To insert and amend the drawings of the proposed employment units.
Gatcombe Farm Industrial Estate West Hay Road Wrington BS40 5GF
Minor amendment to outline planning permission 21/P/0019/OUT (outline application for redevelopment of Gatcombe Farm Industrial Estate entailing demolition and site clearance; construction of up to 38 No. dwellings (class C3) and 450sq.m offices (class E) in 2 No. buildings. Associated works including internal road network, car parking, drainage, open space and play area. Full details provided for access, layout, scale and landscaping. Matters of appearance reserved for subsequent approval) to allow for revised Masterplan with pumping station in south part of site omitted and replaced with garages
Gatcombe Farm Industrial Estate West Hay Road Wrington BS40 5GF
Reserved matters application for appearance pursuant to outline permission 21/P/0019/OUT (Outline application for redevelopment of Gatcombe Farm Industrial Estate entailing demolition and site clearance; construction of 38 No. dwellings (class C3) and 450sq.m offices (class E) in 2 No. buildings. Associated works including internal road network, car parking, drainage, open space and play area. Full details provided for access, layout, scale and landscaping. Matters of appearance reserved for subsequent approval) for 37no dwellings and 335.1 sq.m of commercial floorspace (Use Class E)
Gatcombe Farm Industrial Estate West Hay Road Wrington BS40 5GF
Outline application for redevelopment of Gatcombe Farm Industrial Estate entailing demolition and site clearance; construction of 38 No. dwellings (class C3) and 450sq.m offices (class E) in 2 No. buildings. Associated works including internal road network, car parking, drainage, open space and play area. Full details provided for access, layout, scale and landscaping. Matters of appearance reserved for subsequent approval
Weston Park Lakes Accommodation Road Bleadon
Application for Additional Environmental Approval to extend the time limit for implementation of planning permission 14/P/0746/F2 (large scale major application for Leisure complex together with an Environmental Impact Assessment with change of use from agricultural lakes to tourist facility(D2) providing a water-park for cable-tow wake-boarding, water-skiing, canoeing and other non-powered water-based sports with construction of retaining bank for a series of lakes consisiting of a long lake for triathlon with 2no islands, a main lake with central island, up to 8 masts for cable-skiing, a balancing lake and a training lake. Works to include erection of club house with showers/wc, restaurant/cafe, equipment hire/shop(A1), kitchen(A3 and A4), offices, training facilities and grounds management. Erection of a boat and equipment storage building, boiler room, pumping and control cabins, parking for 65 vehicles , reed-bed treatment plant, associated landscaping with hardsurfaced tracks and water-control features for attenuation of excess water. (part retrospective)