Battleaxes Inn Bristol Road Wraxall BS48 1LQ
Screening Opinion as to whether Environmental Impact Assessment (EIA) is required for a proposed development to create a new mix of uses including community hub, farm shop, café, studio spaces and artisans studios together with retention of the overnight accommodation offer. Erection of 7no. new build low carbon homes and a state of the art Head Quarters office for Studio Hive in the grounds of the property. THIS IS NOT A PLANNING APPLICATION
Land To The South Of Locking Head Drove Locking
Reserved matters application for first access into the site along the southern border pursuant to approval 16/P/2758/RG4 (Outline planning application with Environmental Statement with all matters reserved for subsequent approval for the erection of 700 dwellings (15.07ha of residential land); 14,500 sq.m of office floorspace (1.73ha of employment land B1 Use); retail unit; 420 place 2-form primary school and associated playing fields; landscaping, allotments, open space and necessary infrastructure works and demolition of existing farm buildings within Locking Head Farm (Agricultural Buildings to the east of Locking Head Cottages - NOT including Listed Buildings at Locking Head Farm)
Weston Park Lakes Accommodation Road Bleadon
Application for Additional Environmental Approval to extend the time limit for implementation of planning permission 14/P/0746/F2 (large scale major application for Leisure complex together with an Environmental Impact Assessment with change of use from agricultural lakes to tourist facility(D2) providing a water-park for cable-tow wake-boarding, water-skiing, canoeing and other non-powered water-based sports with construction of retaining bank for a series of lakes consisiting of a long lake for triathlon with 2no islands, a main lake with central island, up to 8 masts for cable-skiing, a balancing lake and a training lake. Works to include erection of club house with showers/wc, restaurant/cafe, equipment hire/shop(A1), kitchen(A3 and A4), offices, training facilities and grounds management. Erection of a boat and equipment storage building, boiler room, pumping and control cabins, parking for 65 vehicles , reed-bed treatment plant, associated landscaping with hardsurfaced tracks and water-control features for attenuation of excess water. (part retrospective)