Land At Worle Quarry Lower Kewstoke Road Weston-super-Mare BS22 9LF
Screening Opinion request to determine as to whether proposed development is EIA development. Development proposed is for a change of use to a use involving the processing of lithium batteries with the following operation development; installation of a new building to house part of the screener deck, hopper box and bag station; installation of associated diesel generators, as shown on the accompanying plans; installation of a number of additional non-permanent or permanent industrial storage buildings; the retention of four non-permanent industrial storage buildings; the retention of alterations and extensions made to an existing building to provide additional storage and office space; the continued siting of three shipping containers which serve as a staff locker room, staff toilets and a secure quarantine area; the retention of one portacabin and caravan which are used together for security and reception for the site; the retention of a 100,000 litre drainage water tank which serves as an overflow and temporary storage for the site drainage system; and the retention and extension of the associated palisade security fencing around the site. THIS IS NOT A PLANNING APPLICATION
Land At Moor Road Yatton
Request to discharge conditions 4 (Tree protection plan and Arboricultural method statement), 5 (Phasing Plan), 6 (Construction Environmental Management Plan), 7 (Biodiversity Protection Plan), 9 (Sample of materials), 11 (Landscape Ecological Management Plan), 12 (Landscape 'Phasing' Planting Plan), 13 (Landscape Scheme), 21 (Generation of up to 15% energy), 24 (Bird nesting and Bat roosting Strategy), 26 (Travel Plan), 27 (Proposed Fencing), 28 (Orchard Management Plan) and 29 (Proposed Play Area) from application no. 19/P/3197/FUL
Land At Long Stay Car Park Bristol Airport North Side Road Felton Wrington
Notification under Regulation 5 of the Electronic Communications Code of the intention to install telecommunications apparatus, works to include; installation of 1no. 15.0m high Swann Group 3OH lattice tower with crowsnest headframe, 3no. proposed multiband antennas fixed to headframe, 1no. GPS Node fixed to top of antenna support pole, 2no. 0.6m transmission dishes fixed below headframe, 1no. 6m x 6m compound formed from 2.1m high palisade fence on three sides and 1m wide access gate, 1no Link A/C MK5B cabinet (1200x600x1500) and other ancillary equipment and underground cabling. THIS IS NOT A PLANNING APPLICATION.
Gowan Croft Church Lane Lower Failand BS8 3SP
Discharge of Condition No.5 (Mesh Fencing Plan), No.6 (Fencing Restricting Pond Access), No.8 (Tree and Hedge Protection) and No.16 (Construction Method Statement) from application 19/P/2685/FUL
Royal Hotel Pier Road Portishead BS20 7HG
Discharge of Conditions 16 (Materials), 17 (Fence Drawings) and 18 (Fixtures Drawings) from application 22/P/0879/FUL.
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 16 (Fencing and other means of enclosure for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended)
10A Parnell Road Clevedon BS21 6DB
Discharge of Condition No.3 (Construction Method Statement), No. 4 (Contamination) and No.12 (Acoustic Fence) on application 20/P/1719/FUL.
Land Accessed Off Wentwood Drive Weston-super-Mare North Somerset
Discharge of Condition No. 11 (Boundary Fence) on application 20/P/1078/FUL
Golden Acres Nursery 35 Clevedon Road Tickenham North Somerset BS21 6RA
discharge of the following conditions No.3, Site Management Plan No. 5 requested materials. No. 8 bike stores No. 9 Car Charging Points No. 12 landscape plan No. ,13 tree/hedge protection fence No. 14 Bat Emergence Survey No. 15 Bat/Bird/insect boxes No 16 The site Investigation. and No ,17 mitigation measure on application 20/P/1260/FUL
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 16 (Fencing and other means of enclosure for Stage 7.2 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended)