Kingston Seymour Water Recycling Centre (WRC) (Previously Referred To As Sewage Treatment Works) Back Lane Kingston Seymour BS21 6UY
Request for a formal screening opinion as to whether an Environmental Impact Assessment is required to be submitted for a proposal to install a new radial flow intermediate settlement tank, a new glass reinforced plastic kiosk to house motor control centre equipment, to replace the existing brick MCC building at the site, a new 5m wide access track (100m in total) from the existing track within the site, and the realignment of the boundary fence within the site (to facilitate the arrangement of the access road) THIS IS NOT A PLANNING APPLICATION