Land At Worle Quarry Lower Kewstoke Road Weston-super-Mare BS22 9LF
Screening Opinion request to determine as to whether proposed development is EIA development. Development proposed is for a change of use to a use involving the processing of lithium batteries with the following operation development; installation of a new building to house part of the screener deck, hopper box and bag station; installation of associated diesel generators, as shown on the accompanying plans; installation of a number of additional non-permanent or permanent industrial storage buildings; the retention of four non-permanent industrial storage buildings; the retention of alterations and extensions made to an existing building to provide additional storage and office space; the continued siting of three shipping containers which serve as a staff locker room, staff toilets and a secure quarantine area; the retention of one portacabin and caravan which are used together for security and reception for the site; the retention of a 100,000 litre drainage water tank which serves as an overflow and temporary storage for the site drainage system; and the retention and extension of the associated palisade security fencing around the site. THIS IS NOT A PLANNING APPLICATION
Kewstoke Primary Kewstoke Road Kewstoke BS22 9YF
Erection of a single storey extension to create Heads Office and lobby; demolition of existing staff room; internal alterations to layout and enclosing of covered area
Weston Park Lakes Accommodation Road Bleadon
Application for Additional Environmental Approval to extend the time limit for implementation of planning permission 14/P/0746/F2 (large scale major application for Leisure complex together with an Environmental Impact Assessment with change of use from agricultural lakes to tourist facility(D2) providing a water-park for cable-tow wake-boarding, water-skiing, canoeing and other non-powered water-based sports with construction of retaining bank for a series of lakes consisiting of a long lake for triathlon with 2no islands, a main lake with central island, up to 8 masts for cable-skiing, a balancing lake and a training lake. Works to include erection of club house with showers/wc, restaurant/cafe, equipment hire/shop(A1), kitchen(A3 and A4), offices, training facilities and grounds management. Erection of a boat and equipment storage building, boiler room, pumping and control cabins, parking for 65 vehicles , reed-bed treatment plant, associated landscaping with hardsurfaced tracks and water-control features for attenuation of excess water. (part retrospective)