Land To The South Of Locking Head Drove Locking
Reserved matters application for first access into the site along the southern border pursuant to approval 16/P/2758/RG4 (Outline planning application with Environmental Statement with all matters reserved for subsequent approval for the erection of 700 dwellings (15.07ha of residential land); 14,500 sq.m of office floorspace (1.73ha of employment land B1 Use); retail unit; 420 place 2-form primary school and associated playing fields; landscaping, allotments, open space and necessary infrastructure works and demolition of existing farm buildings within Locking Head Farm (Agricultural Buildings to the east of Locking Head Cottages - NOT including Listed Buildings at Locking Head Farm)
Weston Park Lakes Accommodation Road Bleadon
Application for Additional Environmental Approval to extend the time limit for implementation of planning permission 14/P/0746/F2 (large scale major application for Leisure complex together with an Environmental Impact Assessment with change of use from agricultural lakes to tourist facility(D2) providing a water-park for cable-tow wake-boarding, water-skiing, canoeing and other non-powered water-based sports with construction of retaining bank for a series of lakes consisiting of a long lake for triathlon with 2no islands, a main lake with central island, up to 8 masts for cable-skiing, a balancing lake and a training lake. Works to include erection of club house with showers/wc, restaurant/cafe, equipment hire/shop(A1), kitchen(A3 and A4), offices, training facilities and grounds management. Erection of a boat and equipment storage building, boiler room, pumping and control cabins, parking for 65 vehicles , reed-bed treatment plant, associated landscaping with hardsurfaced tracks and water-control features for attenuation of excess water. (part retrospective)