Banwell Bypass Land To North And East Of Banwell Including Mitigation Highway Land In Sandford, Winscombe And Churchill
Non-material amendment to vary planning condition 3 of permission 22/P/1768/R3EIA (Construction of a 3.3km single carriageway road from the A371 Summer Lane to A368 Towerhead Road, including a 3m shared use path to Sandford, one bridge, ten culverts, associated infrastructure, and landscaping. Construction of a 0.63km (including junction link to Banwell Bypass) single carriageway Southern Link Road, including associated infrastructure and landscaping. Mitigation and enhancement measures, which consist of environmental mitigation and enhancement measures in connection with the Banwell Bypass and the Southern Link including flood compensation areas, planting and habitat creation, attenuation basins, replacement playing fields at Banwell Football Club, associated infrastructure and landscaping. Placemaking improvements within Banwell, comprising mitigation and enhancement measures to the public realm. Demolition of a wall at 25 Castle Hill. Active travel routes including works to footpaths, cycleways, and bridleways. Improvements to the wider local road network in Sandford, Churchill, Winscombe and Locking and creation of shared use paths between Sandford and Churchill and Langford and Churchill) to allow for the phasing of both construction and operational stages, through works phases and occupation phases (opening of the Scheme to vehicular traffic)
Land To East Of Youngwood Lane Youngwood Lane Nailsea
Discharge of condition No. 03 ( electric vehicle charging ) No. 09 ( parking facilities for bicycles ) No. 11 ( sample panels of the materials ) No. 12 ( storage of refuse ) No.13 ( Construction Environmental Management ) No. 14 ( Landscape and Ecological Management, No. 15 ( ecological mitigation measures ) No. 16 ( surface water drainage ) and No. 17 ( approved sustainable drainage ) on application 20/P/0861/FUL
Conygar Quarry Nortons Wood Lane Clevedon North Somerset
Change of use from dis-used Quarry to Indoor and Outdoor Climbing Activity Centre; to include the erection of 4no. supporting buildings and outdoor climbing structures (Indoor Climbing Centre, outdoor climbing structure, Cafe/Restaurant, Maintenance building and Workshop). Installation of full boundary fence, landscaping, widen entrance and construction stone wall directly onto Nortons Wood Lane, installation of solar panels, provision of car parking spaces, electric vehicle charge points and cycle lockers /locking racks with supporting wash area.
Blagdon Water Garden Centre Bath Road Langford North Somerset BS40 5DN
Request to discharge conditions 13, (Soft and hard landscape), 18, (Construction method statement) 19, (Surface water works Condition) and 20 (SuDS) on application 19/P/1963/FUL.
Land SW Of Long Ashton Park And Ride, Off Gurney Roundabout (A370) And Colliters Way Long Ashton
Request for formal screening and scoping opinions as to whether proposed development is Environmental Impact Assessment development and the requirements of an Environmental Statement if required to be submitted with a haybrid planning application for the construction of new office campus on phased basis. Phase one in full comprising including three office buildings, culinary building, training centre and auditorium. Phase two in outline comprising two further office buildings. Use (Class E(g)(i)); New accesses from the public highway, internal site roads and footpaths, public realm works and landscaping. Below ground car and cycle parking, ancillary plant and servicing and other associated works. THIS IS NOT A PLANNING APPLICATION
Land At Moor Road Yatton
Request to discharge conditions 4 (Tree protection plan and Arboricultural method statement), 5 (Phasing Plan), 6 (Construction Environmental Management Plan), 7 (Biodiversity Protection Plan), 9 (Sample of materials), 11 (Landscape Ecological Management Plan), 12 (Landscape 'Phasing' Planting Plan), 13 (Landscape Scheme), 21 (Generation of up to 15% energy), 24 (Bird nesting and Bat roosting Strategy), 26 (Travel Plan), 27 (Proposed Fencing), 28 (Orchard Management Plan) and 29 (Proposed Play Area) from application no. 19/P/3197/FUL
Blagdon Water Garden Centre Bath Road Langford North Somerset BS40 5DN
Request to discharge condition numbers, 10 - Tree protection method statement, 16 - Construction environmental management plan (CEMP) and 17 Landscape ecological management plan (LEMP) on application 19/P/1963/FUL.
Land South Of Dinghurst Road Churchill North Somerset
Request to discharge condition numbers 7 (Landscape and Ecological Management Plan (LEMP) produced by Pegasus Group), 8 (Construction Method Statement CMS), 11 (Drainage Layout drawing Ref: P21-0266-PEG-XX-XX-DR-C-0501-P02 Drainage Layout by Pegasus Group), 22 (Construction Ecological Management Plan ,CEMP) and 27 (Design Stage SAP Assessment for each dwelling, along with modelling schedule) on application 21/P/2123/OUT.
Gatcombe Farm Industrial Estate West Hay Road Wrington Bristol BS40 5GF
Non material amendment to application 22/P/1256/RM (Reserved matters application for appearance pursuant to outline permission 21/P/0019/OUT (Outline application for redevelopment of Gatcombe Farm Industrial Estate entailing demolition and site clearance; construction of 38 No. dwellings (class C3) and 450sq.m offices (class E) in 2 No. buildings. Associated works including internal road network, car parking, drainage, open space and play area. Full details provided for access, layout, scale and landscaping. Matters of appearance reserved for subsequent approval) for 37no dwellings and 335.1 sq.m of commercial floorspace (Use Class E). To insert and amend the drawings of the proposed employment units.
13 - 14 Claremont Crescent Weston-super-Mare BS23 2ED
Listed building consent for landscaping of rear amenity, including the construction of steps and retaining wall to numbers 13-14 Claremont Crescent