Cramlington Biomass CHP Plant Windmill Industrial Estate Cramlington Northumberland NE23 3JA
Non-material amendment pursuant to planning permission 16/01352/VARYCO for removal of the existing internal roundabout and replacement with a Fuel Mixing and Blending Facility, construction of a 6m high concrete wall along the western, northern and southern edge of the new Facility, realignment and resurfacing of part of the existing internal access road around the new Facility, construction of new area of access road around existing log storage area, construction of a footway along the western, northern and southern edge of the concrete pad, construction of a transition slab on the eastern edge of the concrete pad and 3 x 12m lighting columns with top bracket for 2 x luminaire (ALUX FL-200-PLUS-85x135 Lamp LED
Burndene 5 Crabtree Road Stocksfield Northumberland NE43 7NX
Non-material amendment (Flat canopy above front bay windows (x2) modified from flat to sloping canopy in slate covering to match roof, all windows modified from UPVC construction to Aluminium no colour change, garage window pane orientation corrected to vertical, new/additional aluminium kitchen window 1500mm wide x 1200mm high to match bathroom window and Bi fold door reduced in width from 4200mm to 3200mm) on approved application 21/01792/FUL
Thomas Sherriff And Co Ltd Tweedside Trading Estate Tweedmouth Berwick-Upon-Tweed Northumberland TD15 2XD
Non Material Amendment to allow the revised proposal for two structures with ancilliary plant and machinery measuring 1550m2 in total, the amended floor areafloorplan area is therefore 14% less (250m2) with a building massing reduced by 48%. These reductions constitute a minor amendment that reduces overall development impact in every dimension. 4 x 4MW boilers housed in a low rise block of 8.9m in height with the highest structures being the external filters at 11.1m. These replace the single larger boiler. The fuel store is no longer required but that footprint will now be required to house a 12MW electrical boiler, the dimensions of this second building remain similar at 12m to the ridge and a footprint of 448m2 (included in the 1550m2 total) Existing 4-core stack of 26m height becomes 4 x single core stacks of the same height offering better stack dispersion. Emissions to air from 16MW biomass are nominally 20% less by volume than from 20MW biomass. Although the biomass is designed to run year round, in practicethe electric boiler will run in its stead (with the biomass dormant) for approximately 35% of the year. This also reduces HGV fuel transport movements by around 45% overall. There is no emission from the 12MW electric boiler. The AQA shows that any impact on the nearest receptor to be inconsequential. Retention of the Sherriff building creates a significant carbon footprint reduction from the reduction in construction materials etc required as well as the energy required for demolition and the transport and disposal of demolition waste. The existing building will now be preserved and re-purposed to serve as a fuel store. This means that much of the consented roadway is no longer required and the existing road way will be re-purposed and improved. Reduce the overall yardage within the red line. The combined 16MV biomass plus 12MW electric potential displaces more fossil fuel use than the consented proposal on approved application 20/03811/FUL
Tranwell House And Tranwell Cottage Tranwell Morpeth Northumberland NE61 6AF
Construction of new driveway access for Tranwell Cottage with associated dropped kerb to highway and amendment to existing driveway
Land North East Of New Hartley St Michaels Avenue New Hartley Northumberland
Variation of condition 15 of planning permission 20/03342/VARYCO to amend construction delivery hours in respect of development for 285 dwellings with associated infrastructure and landscaping.
Briarside Ogle NE20 0AU
Construction of a replacement side extension for existing conservatory, amendment to window and door positions on south elevation and addition of 3 skylights to south elevation
Barratt Homes South Fields Hepscott Northumberland
Variation of Condition 1 (approved plans) pursuant to 20/01064/varyco - in order to amend Plot 431 - Remove garage, Plot 432 - site to the west and construction of double garage, Plot 433 - house type changed from Denby to Radleigh, Plot 434 - house type changed from Denby to Maidstone and terraced with plots 435 and Plot 436 (revised description)'.
Plessey North Farm Fisher Lane Cramlington Northumberland NE23 8AU
Non-material amendment relating to planning permission 18/00573/FUL to allow amended garage construction materials from block to timber frame with stone skin, garage doors amended to 4 single doors, additional external door/internal staircase to other end of garage and addition of high level windows to each gable end
Land West Of Meadow Court House Runnymede Road Darras Hall Newcastle Upon Tyne Northumberland
Construction of 1no. residential unit - amendment to existing approved consent 19/04445/FUL. Site has been divided into two plots and application looks solely at plot 3, previously plot 4.
Land South Of Glebe Farm Choppington Road Choppington Northumberland
Non-material amendment to condition 8 (provision of footpath through site during construction) on approved planning application 19/01457/REM