Land North And East Of Holmeside Bungalow Birk Road Heddon-On-The-Wall Northumberland NE15 0HF
Certificate of proposed lawful development to establish that building works, as per the description of the application approved (Revision of permission 17/00136/FUL for the demolition of existing building and relocate and amend the design of a new dwelling with associated access (as amended 06.09.2019)) started on site before the expiry of the already granted planning approval (Application No. 19/01319/FUL)
41 Watershaugh Road Warkworth Northumberland NE65 0TX
Demolition of existing sun room and front porch. Re-roof and raise wall height of existing garage. Remodelling of elevations to include: amend existing window and door openings and render externally. New front porch.
1-4 The Square Guide Post Choppington Northumberland NE62 5BZ
Non - material amendment (Vary the wording of condition 3 to add "other than demolition". i.e "The development hereby permitted shall not be commenced, other than demolition, until a scheme to deal with contamination of land or controlled waters has been submitted to and approved in writing by the Local Planning Authority) on approved application 21/03733/FUL. .
Thomas Sherriff And Co Ltd Tweedside Trading Estate Tweedmouth Berwick-Upon-Tweed Northumberland TD15 2XD
Non Material Amendment to allow the revised proposal for two structures with ancilliary plant and machinery measuring 1550m2 in total, the amended floor areafloorplan area is therefore 14% less (250m2) with a building massing reduced by 48%. These reductions constitute a minor amendment that reduces overall development impact in every dimension. 4 x 4MW boilers housed in a low rise block of 8.9m in height with the highest structures being the external filters at 11.1m. These replace the single larger boiler. The fuel store is no longer required but that footprint will now be required to house a 12MW electrical boiler, the dimensions of this second building remain similar at 12m to the ridge and a footprint of 448m2 (included in the 1550m2 total) Existing 4-core stack of 26m height becomes 4 x single core stacks of the same height offering better stack dispersion. Emissions to air from 16MW biomass are nominally 20% less by volume than from 20MW biomass. Although the biomass is designed to run year round, in practicethe electric boiler will run in its stead (with the biomass dormant) for approximately 35% of the year. This also reduces HGV fuel transport movements by around 45% overall. There is no emission from the 12MW electric boiler. The AQA shows that any impact on the nearest receptor to be inconsequential. Retention of the Sherriff building creates a significant carbon footprint reduction from the reduction in construction materials etc required as well as the energy required for demolition and the transport and disposal of demolition waste. The existing building will now be preserved and re-purposed to serve as a fuel store. This means that much of the consented roadway is no longer required and the existing road way will be re-purposed and improved. Reduce the overall yardage within the red line. The combined 16MV biomass plus 12MW electric potential displaces more fossil fuel use than the consented proposal on approved application 20/03811/FUL
Athol House Callerton Lane Ponteland Newcastle Upon Tyne Northumberland NE20 9EG
Non material amendment of condition 14 (noise assessment) to allow demolition of existing building prior to submission and approval of a noise assessment on planning approval 19/01223/FUL
West Unthank Farm Unthank Road Haltwhistle NE49 0HX
Variation of Conditions 2 (approved Plans) and 3 (Demolition Plan) pursuant to planning permission 18/00330/FUL in order to amend the roof material and to provide opening glass sliding panels